Cadastres -- United States; Mineral resources conservation -- United States
Intersections and areas of conflict should then be calculated by solving
triangles. Areas may be calculated using double meridian distances, but
intersections should never be calculated by forcing a closure.
Intersections may be checked by closure.
A special situation exists where a former survey excluded an unsurveyed
location from the patent and the unsurveyed location has subsequently
been abandoned. This area is designated as a tract and its boundaries
are determined from the prior survey. See Tract A of the Jim Dandy Lode
described in the specimen field notes and plat of the Manual of
Surveying Instructions.
Another use of a tract is for the purpose of excluding a small area
surrounding the discovery of another location not embraced in the
survey.
Intersections and areas of conflict with patented lands containing
mineral rights must also be calculated.
Supporting calculation sheets need not be furnished the Bureau of Land
Management but computer tapes, if available, will be helpful. The BLM
can perform the necessary checks by computer.
=5–9= Preliminary Plat: The mineral surveyor will find it advantageous
to prepare preliminary plats prior to writing the field notes. One plat
should provide the base and give all the details of the survey with
items of topography and culture secondary. This plat may be prepared in
pencil or ink at the option of the mineral surveyor. It should be such
that legible blue lines copies can be furnished to the Bureau of Land
Management along with the notes, and to the claimant. It should clearly
state that it is a PRELIMINARY PLAT SUBJECT TO CORRECTION. Some offices
of the Bureau of Land Management may request a reproducible copy.
Plats on linen are no longer required. A secondary plat showing the
topography and culture in detail will be an aid in writing field notes,
but is not required by the BLM.
If drill holes are part of the improvements and are too numerous to show
on the base plat, a separate plat is advisable.
=5–10= Field Notes: A detailed set of specimen field notes is contained
in the Manual of Surveying Instructions which should be followed for
form and content. There are, however, some inconsistencies: The title
page shown in the manual should not be used. Use current Form 3400–11,
as supplied by the Bureau of Land Management.
The locations should be listed in the same order that they are described
in the field notes, thereby serving as an index.
The field notes begin with a description of instruments and the mean
results of the solar or other azimuthal observations. The latitude and
longitude of the observing station is given. If this is not at a corner
of the survey, the latitude and longitude of the first corner described
should be given, thus:
At Cor. No. 1 of the Jim Dandy lode, identical with Cor. No.
1 of the Prince Lode of this survey, in latitude 38°45′ N,
and longitude 106°20′ W.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account