vacancy thus left at the top was repeatedly refilled, until all
remained solid; the top was then pointed, and, when necessary,
defended by a coat of plaster. When the whole of the foundation was in
this manner brought to a level, some other means was necessary of
attaining the like degree of security. For this purpose the central
stone of the sixth course had a hole of one foot square cut quite
through the middle. Eight other depressions of one foot square and six
inches deep were also sunk at equal distances in the circumference. A
plug of strong hard marble, from the rocks near Plymouth, one foot
square and twenty-two inches in length, was set with mortar in the
central cavity, and fixed firmly therein with their wedges. This
course was thirteen inches in height, so that the marble plug, which
reached through it, stood nine inches above the surface. Upon this the
centre-stone of the seventh course was fixed, having a similar hole
made in its centre, bedded with mortar and wedged as before. By this
means no force of the sea acting horizontally upon the centre-stone,
less than what was capable of cutting the marble plug in two, was able
to move it from its place; and to prevent the stone the more
effectually from being lifted, in case its bed of mortar should happen
to be destroyed, it was fixed down by four trenails. The stones
surrounding the central stone were dove-tailed to it in the same
manner as before, and thus the courses proceeded with no other
interruption than arose from the nature of the situation.
Smeaton tells us that when the work had proceeded so far as to afford
a level platform, the pleasure he took in it, and the novelty of the
thing, led him to walk to and fro upon it with much complacency. But
making a false step, and not being able to recover himself, he tumbled
over the brink of the work down among the rocks on the west side. The
tide had then retreated, so that no serious result happened, but in
his fall he dislocated his thumb, and as no medical aid could be
procured, he set it himself, and then returned to his work. It was
more than six months, however, before he recovered the full use of his
thumb.
Owing to very boisterous weather, and repeated losses of the necessary
materials left on the rock, the seventh course was not laid until the
7th of September. But Smeaton had the satisfaction to find that all
the work actually completed, stood the utmost severity of the weather
unmoved. At this time the sea became so calm that the work proceeded
rapidly, and for three days in succession the top of the work was not
wetted. The eighth course was completed on the 13th, but the weather
again becoming unfavourable, the ninth was not finished until the
30th, and here Smeaton found it desirable to close the operations for
this year.
Public-domain text, read in full here on John Shaqi.