I found that, if the aperture was on the side away from the embankment,
there was a decided tendency for the obelisk to jam against the
opposite wall of the funnel. If, on the other hand, the sand ran
out from the near side, the obelisk came down resting against the
embankment wall, with its edge where the slot should be. It seems
most likely that the sand was removed, not from the tunnel shewn on
plate VIII, but from one on the opposite side, leading out from under
the embankment. The tunnel shewn in the plate seems necessary for the
proper cleaning of the pedestal before the obelisk was pulled upright.
In a subsequent model, in which the side of the funnel was vertical and
made of glass, I was enabled to examine the base of the obelisk and the
levels of the sand during the descent. The results shewed no reason
for modifying the diagram on plate VIII except in the manner mentioned
above.
It is possible that the sand was removed from above until the obelisk
was low enough for there to be no fear of a jam; after that point had
been passed, it would not matter from which side of the pedestal the
sand was removed.
I realise that if the model were enlarged up to full-size, the grains
of sand would be at least one centimetre in diameter. It seems to me
that, using ordinary sand with a full sized obelisk, the flow would
be better than is the case in the model, as there would be less
skin-friction with the sides of the funnel. On the other hand, there
may well be factors, unforeseen by me, which might render the behaviour
of the full-sized obelisk different from that of the model, so I give
these results without insisting that they are a _proof_ that such a
method is possible for erecting obelisks.
Another point arises in connection with the funnel; this is the
possibility of the _side_ walls of the funnel having been constructed
vertically, the width of the funnel being only slightly greater
than the width of the base of the obelisk. The advantage of this
modification would be that if sand were piled on to the obelisk in
the initial stages of its descent, the weight of the sand would be a
great help in forcing the base down the funnel past the point where it
might be likely to jam. It would, however, make the examination of the
obelisk during its descent a difficult matter owing to lack of space.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account