The binding of the Nile and the new SoudanPeel, Sidney Cornwallis
History
The binding of the Nile and the new Soudan
Peel, Sidney Cornwallis
Irrigation -- Egypt; Nile River; Sudan (Region)
In principle the Assiout Barrage is exactly the same as that at
the point of the Delta, and the difficulties of construction were
also exactly similar, for in both cases the foundations had to be
laid on the same shifting sands, and as each section of the work
was undertaken a portion of the river had to be diverted from its
course by means of temporary earthen dams. The shifting nature
of the river-bed, the almost personal malignity of the water,
constantly bursting through in countless springs, each of which had
to be separately dealt with and suppressed, called forth the highest
exercise of engineering skill. But the experience gained in the long
struggle with the imperfections of the earlier Barrage infallibly
told its tale. Every difficulty was successfully encountered, and
the Assiout Barrage was completed by the summer of 1902, and was able
to hold up the 10 feet of water required of it, without any failure,
at the first attempt.
The visible part of this Barrage, which is just over half a mile
in length, consists of a viaduct or bridge with 111 archways, each
16 feet 5 inches in width, closed by strong iron gates, working in
grooves made in the supporting piers, and raised or lowered from
above. In contrast to the Delta Barrage, it is built throughout of
stone, and not of brick. At the western end is a lock, the largest
in Egypt, through which the largest of the boats that ply upon
the Nile can easily pass. Below the water lies the strength of the
structure. The viaduct rests upon a solid platform of granite and
cement, 10 feet deep and 87 feet wide, set at a suitable depth below
the bed of the river. As a further precaution against the action of
the water, there are also below the platform two continuous lines
of iron sheet-piles, with hermetically sealed joints. With such a
series of obstacles to encounter, the danger of the water forcing
its way through underneath the Barrage is small indeed. The whole
amount of masonry used in this Barrage is 220,000 cubic yards.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account