That bridge, with constant repairs and one almost entire renewal, stood
firm in its place until the year 1856, when it was removed to make room
for the present iron bridge. The old piers were much enlarged and
strengthened, and also raised about three feet higher to receive the new
bridge. As nearly every stranger inquires how the first bridge was
carried over the turbulent waters, a brief description of the process
may be acceptable. First, a strong bulkhead was built in the shallow
water next to the shore; a solid backing was put in behind this, and
the upper surface properly graded and well floored with plank. Strong
rollers were placed parallel with the stream and fastened to the floor.
In the old forest then standing near by were many noble oaks, of
different sizes and great length. A number of these were felled and
hewed "tapering," as it was termed, so that, when finished, they were
about eighteen inches square at the butt, fifteen at the top, and eighty
feet long. Through the small ends were bored large auger-holes. These
sticks were placed, as required, on the rollers, at right angles to the
stream, the small ends over the water, and the shore ends heavily
weighted down.
[Illustration: SECOND MOSS ISLAND BRIDGE]
The first stick being properly placed, levers were applied to the
rollers and the stick was run out until the small end reached an eddy in
the water. Then another similar stick was run out in like manner,
parallel to the first, and about six feet from it. A few light, strong
planks were placed across and made fast. Two men were provided each with
strong, iron-pointed pike-staffs, each staff having in its upper end a
hole, through which was drawn some ten feet of new rope. Thus provided,
they walked out on the timbers, drove their iron pikes down among the
stones, and tied them fast to the timbers. Thus the whole problem was
solved. Around these pike-staffs the first pier was built and filled
with stone. Then other timbers were run out, all were planked over, and
the first span was completed. The other spans were laid in the same way.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account