One of the first really good granite pavements introduced into London
was that known as the “Euston Pavement,” and it was constructed in the
following manner: The foundation was shaped to the intended surface of
the finished roadway; upon this a layer of coarse gravel was spread 4
inches in thickness, this was well rammed,[61] and upon it was spread 4
inches of gravel mixed with a small quantity of chalk to bind it; this
again being well rammed, upon it was placed a similar layer only
composed of finer gravel, and upon this foundation the stones were
placed, being bedded upon about an inch of fine sand. The stones used
were Mount Sorrel granite, which were hammer-dressed and squared, 3
inches in width by 4 inches in depth; they were set close together at
right angles with the lines of the kerb, they were then thoroughly
rammed by the pavior. The whole surface was afterwards covered with
screened gravel which was allowed to find its way into the joints and
thus steady the entire pavement.
The following section will explain this.
[Illustration]
In many cases the foundation is simply formed by shaping the soil to the
required contour, and covering this with 3 or 4 inches of gravel or
cinders, which is afterwards either rammed or consolidated by the
traffic; upon this the setts are placed as closely as possible, the
joints are then filled with fine gravel well worked in with a “cramming
iron,” the whole surface being then covered with a grouting of lime and
sand, which is brushed into the joints with a stumpy broom.[62]
In Leeds, Manchester, Salford, and many other important cities, I
believe the foundations are formed in the manner just described, but of
greater depth, the grouting also is a bituminous mixture, which I will
presently describe, instead of the ordinary lime grouting.
The paved streets of Manchester are proverbial for their excellence,
which is attributable to the manner in which the foundations of the
streets are consolidated by the traffic before any setts are placed on
them; in many cases the old macadamised surface of a street being
utilised as a foundation, this process being almost identical with that
recommended by Sir Henry Parnell fifty years ago.[63]
Where the traffic is heavy, however, a firmer foundation even than this
is necessary, and up to the present time no better foundation has been
introduced than that of good Portland cement concrete. This should be at
least 9 inches in thickness, and be composed of one part of Portland
cement, two parts of clean sharp river sand, and four parts of clean
river ballast, or broken stones, or other suitable material. The surface
of the concrete, after having been placed in position, should be
smoothed over with the shovel, so as to present the proper convexity and
have an even surface for the granite setts to be bedded upon.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account