Cunard Steamship Company, ltd.; World War, 1914-1918 -- Naval operations
Even under normal conditions, the construction and fitting out of
this the largest aeroplane factory in the country would have been a
herculean task, but in war time, with the resultant difficulties to
be encountered in obtaining the necessary material, the undertaking
might well have baffled even the most enterprising brains. That it was
accomplished at all is, perhaps, the best proof of the enormous reserve
of initiative and capability that had been accumulated by the Company
during the long years of its previous expansion; and some idea of what
was achieved can perhaps be more easily obtained when it is remembered
that the largest shop measured not less than 700 by 500 feet, and that
there were several other shops each of which were about half this size;
that for the necessary electrical power a cable had to be laid for a
distance of six miles from the Lister Drive generating station; that,
the local water and gas supply being totally inadequate, a supply well
had to be sunk to a depth of 370 feet, thus providing the factory’s own
water supply; that a special gas main had to be laid for a considerable
distance; that a new siding from the Lancashire and Yorkshire Railway
had to be constructed, the line running right into the factory’s
grounds; that the machinery and equipment had to be assembled not only
from every part of the United Kingdom, but from the United States of
America; that several of the most essential machines, which had been
specially made, were lost in transit owing to the action of enemy
submarines, so that new machines had to be made in their place; and
that a canteen had to be provided, fully equipped with the latest
cooking utensils and labour saving devices, which would accommodate at
two sittings no less than 5,000 people.
[Illustration: THE “AQUITANIA’S” LOUNGE (Once a hospital ward, it was
used subsequent to the Armistice as an orderly room)]
[Illustration: OFFICERS’ WARD IN THE SMOKING ROOM OF THE “AQUITANIA”]
In spite of all this, however, the first complete aeroplane was turned
out on June 7th, 1918, just eight months after the commencement, while
within four or five months after this, the factory was in a position to
turn out no less than 100 aeroplanes a month. Before this, however, the
Ministry of Munitions had appointed a controller of National Aircraft
Factories, so that on the 17th of October, 1918, the factory was handed
over to the Government in full working order, another concrete instance
of the organising skill and versatility of this great Mercantile Marine
Company.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account