By this melancholy list we find, that no fewer than sixteen vessels
have, in the course of nine years, been either lost or stranded on
the Carr Rocks, being almost at the rate of two wrecks in the year.
From this alarming state of things, it was thought advisable to bring
the subject under the notice of the Commissioners of the Northern
Light-houses, when the Board immediately ordered a Floating-buoy, of a
large size, to be moored off the Carr. The moorings for this buoy were
laid down, upon the 18th of September 1809, in 10 fathoms water, at the
distance of about 200 fathoms, in a north-eastern direction, from the
rock. But, owing to the heavy swell of sea, and the rocky sandstone
bottom on this part of the coast, it was found hardly possible to
prevent the buoy from occasionally drifting, even although it had been
attached to part of the great chain, made from bar-iron, measuring
1½ inch square, with which the Bell Rock floating light had been
moored for upwards of four years, without injury. The moorings of the
Carr Rock-buoy, from the continual rubbing upon the sandstone bottom,
were worn through with the friction in the course of ten months; and
during the four years which it rode here, though regularly examined and
replaced, in the proper season of the year, it was no less than five
times adrift, to the great inconveniency and hazard of shipping.
[Sidenote: A Beacon of masonry is resolved on.]
Under these circumstances, the Light-house Board was induced to
erect a Beacon of masonry upon the Carr Rock itself, instead of the
Floating-buoy. This work was commenced in the month of June, in the
year 1813, under the direction of the writer. The stone for this
building was taken from an excellent sandstone quarry on the property
of Lord Kellie, near the mouth of Pitmilly Burn: But, owing to the
smallness of the rock, the depth of water upon it, and the exposed
nature of the situation, the work was afterwards attended with very
great difficulty.
[Sidenote: Dimensions of the Carr Rock.]
The length of the Carr Rock, from south to north, measures 75 feet;
but its greatest breadth, as seen at low-water of spring-tides, being
only 23 feet, it was found to be impracticable to obtain a base for a
building of greater diameter than 18 feet. Such also was the fractured
and rugged state of the surface of this rock, that it became necessary
to excavate part of the foundation-pit of the building to the depth of
seven feet. The difficulties of this part of the work were also greatly
increased, owing to the foundation, on the eastern side, being under
the level of the lowest tides: so that it became necessary to construct
a coffer-dam. Part of this coffer-dam it was necessary to remove, and
carry ashore, after each tide’s work; and on the return of the workmen
at ebb-tide, a considerable time was unavoidably occupied in fixing the
moveable part of the coffer-dam, and in pumping the water out of the
foundation-pit.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account