In the year 1816, or fourth season, the work was continued till the
month of November, when the building had attained the height of about
20 feet, or the 16th course, and still wanting 18 courses to complete
the masonry. In this state, it was left till the following season,
having been previously loaded with about four tons of lead, cast in
suitable pieces, and suspended within the void or central hollow of
the building. The operations of the fourth season had been also much
retarded by several untoward accidents. In particular, a heavy gale
overtook the workmen while they were laying the 7th course, which
obliged them to leave the rock before the precautionary measures could
be taken, for closing and completing the work immediately in hand; in
consequence of which, the stones on the eastern, or weather-side of
this course, were lifted off their bases, the oaken trenails broken,
and five of the blocks of stone swept away. At another period, the
Pozzolano mortar of the beds of two of the stones was washed out, and
so much injured, that the stones required to be lifted and relaid. The
works were this season intended to have been closed early in the month
of October, when another unlucky gale sprung up, just as the sixteenth
course had been laid, which lifted seven of the stones off their beds;
but they were fortunately held by the oaken trenails, and in this state
they remained for about three weeks, before a landing could possibly be
effected, to replace them.
[Sidenote: Fifth year’s work.]
In the month of June 1817, the fifth year’s work was begun, and the
remaining courses of the masonry were built; but in the month of
November, the coast was visited with a gale of wind at south-east,
accompanied with a heavy swell of sea, which, unfortunately, washed
down the upper part of the building, and reduced it to the height of
the fifth course, which formed part of the fourth year’s work.
[Sidenote: Beacon finished with cast-iron pillars and ball.]
Instead, therefore, of completing this Beacon with masonry, as had
been originally intended, and providing the Machine and large Bell,
which was to have measured 5 feet across the mouth, to be tolled by
the alternate rise and fall of the tide, it now became a matter of
consideration in what form the upper part of this design should be
finished. The Board ultimately determined on the erection of six
columns of cast-iron upon the remaining courses of masonry. These
columns are put together with spigot and facet joints, strongly
connected with collars and horizontal bars of malleable iron; the whole
terminating with a cast-iron ball, formed in ribs, elevated about 25
feet above the medium level of the sea. In this manner the Carr Rock
Beacon was at length completed, in the month of September 1821, after
six years work. The following is the notice and description of it given
to the public:
[Sidenote: Bearings and Description of the Carr Rock Beacon.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account