The general plan of the scheme is shown by Fig. 14 and Fig. 2, Plate
XVIII. The roof, which has an area of 1 hectare, has been laid out with
walks and grass plots, and the surrounding embankments have been
converted into driveways. Above the reservoir a small plazuela of 1/2
hectare has been laid out with a space above it for a band-stand. The
whole of the ground has been encircled with carriage drives, on which it
is the intention to plant shade trees. The lay-out of this land also
embraced the scheme for protecting the reservoir by draining the
surface-water away to the irrigation ditches.
COMPARISON OF SOUTH AND OBISPADO RESERVOIRS.
The two reservoirs are practically of the same capacity, the only
difference being the level of the overflows in their relationship to the
roof, which gives the Obispado Reservoir a slightly greater capacity.
Some comparative figures may be of interest, owing to the differences in
type and construction. Table 7 gives the comparative quantities of
material in each reservoir proper, that is to say, exclusive of the
valve-houses, lay-out of grounds, etc.
TABLE 7.--COMPARISON OF MATERIALS IN SOUTH AND OBISPADO RESERVOIRS.
==========================+===============================+============
| SOUTH RESERVOIR. | _OBISPADO RESERVOIR._
+--------+-------------+--------+------------
| | Quantities, | | Quantities,
| No. | in cubic | No. | in cubic
| | meters. | | meters.
--------------------------+--------+-------------+--------+------------
_Earthwork:_ | | | |
Total excavation | ... | 34,000 | ... | 56,479
Placed in embankment | ... | 31,500 | ... | 7,255
Placed in spoil banks | ... | 2,500 | ... | 49,224
+--------+-------------+--------+------------
_Concrete:_ | | | |
Columns (including | | | |
foundations) | 135 | 1,240 | 356 | 543
Primary beams | 135 | 440 | 374 | 462
Secondary beams | 670 | 515 | 1,252 | 576
Side-walls | ... | 1,255 | ... | 710
| | | |
| Square | | Square |
| meters.| | meters.|
Roof slab | 5,140 | 520 | 10,206 | 1,020
Floor | 4,070 | 780 | 9,200 | 2,120
Parapet walls | ... | 90 | ... | 165
+--------+-------------+--------+------------
Total concrete | ... | 4,840 | ...
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account