The telephone system suffered the loss of the entire northern exchange
and of the harbor cable--broken through ships dragging anchor--a total
material damage of one hundred thousand dollars. Its personnel was also
depleted. Nevertheless telephone business may be said to have been
generally resumed on the seventh, the day after the disaster, and the
load of local traffic soon attained over one hundred and twenty percent
above its average figure. Telephone service was absolutely suspended for
only about two hours,--the period of prohibition from buildings,--and
the cable telephone for about three days. Messages of a social character
were tabooed for several weeks, when the work again became normal.
The illumination service was quickly restored. The company was able to
give partial light and some service from noon on the sixth. Periods of
intermittent darkness however, were not unusual. Gas service was off
until December the ninth--the top of the gasometer having been broken
and two hundred thousand cubic feet deflected from the mains into the
air--when repairs were completed and on the tenth the service resumed.
On the fourteenth gas and electric light service became normal.
Railroad communication had been dislocated. The explosion occurred in
the vicinity of the principal sidings and vital portions of the system.
Three miles of the main road were buried in debris, the station wrecked,
equipment damaged, and crews scattered searching for their dead. In
spite of this, as already noted, a hospital train was sent out in the
early afternoon of the disaster day and incoming trains were switched to
their new tracks leading to the south end terminal. On the evening of
the day following the disaster--Friday--the first regular train for
Montreal left the city. Two days later the main lines were clear and the
first train left the old passenger station on Saturday evening. By
Monday the full passenger service was resumed, to and from the station.
Eight days after the catastrophe all branches of the service were
working and conditions were fairly normal.
The rolling stock of the street-car system sustained much damage. Some
of the employees were injured and others were unavailable. A scant
service was restored at noon on December the sixth. By six o'clock of
the seventh, tram lines in the north section were able to resume an
eight-car service. Then the blizzard came and tied up all lines. It was
not until Sunday, December ninth, that it was possible to resume any
semblance of car service. On the twenty-second of December, twenty-two
cars were operating--twenty-seven is the normal number,--but the
shortage of men made it difficult to operate the full number. The
service was not entirely normal for some months owing to the severe
storms all winter which tied up the lines and caused delays, and to the
shortage of men to handle the cars.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account