History of the 1/4th Battalion Duke of Wellington's (West Riding) Regiment, 1914-1919.Bales, P. G.
History
History of the 1/4th Battalion Duke of Wellington's (West Riding) Regiment, 1914-1919.
Bales, P. G.
Great Britain. Army. Duke of Wellington's (West Riding) Regiment; World War, 1914-1918 -- Regimental histories -- Great Britain
On April 23rd the Battalion moved by motor bus to Hedauville, and then
followed two months of working parties in the area held by the 36th
Division. All this work was in preparation for the attack which was
soon to be launched, in conjunction with the French. The Battalion’s
first job was the digging of assembly trenches in Aveluy Wood. Daily
the men were taken up by motor bus as far as Bouzincourt, and marched
from thence to their work. It was all task work and the tasks were very
heavy. The ground was full of roots, which greatly hindered digging,
and, a foot or two below the surface, much flint was encountered. But
very good work was done in spite of these difficulties. There Capt.
C. Jones, C.F., first became prominent. He had not been long with the
Brigade, but he soon became very popular with the men, taking a shovel
himself and digging with the best of them, in all weathers.
The life in the woods was really quite enjoyable, in spite of
occasional spells of rain. Hedauville Wood was full of nightingales,
and many men sat out at night to listen to their song. Beetles also
abounded and were not so much appreciated; often it was necessary to
get up at night to catch enormous flying specimens of these insects.
Strange to say, the enemy artillery made little attempt to harass
troops in the area. The Germans must have had a good idea of the attack
which was impending. They had good ground observation and plenty of
aeroplanes. Martinsart village was crowded with troops and, in the
evenings, there were sometimes thousands in its streets. Yet it was
never shelled.
It is unnecessary to go into full details about this period. Most of
the work was much of the same type. Digging was done both in Aveluy and
Martinsart Woods; the Battalion was billeted first in one and then in
the other, in order to be near its work. Once it had to carry up gas
cylinders for an operation of the 32nd Division. Perhaps this job was
the indirect cause of a gas alarm which occurred two nights later. At
any rate, someone thought he heard a Strombos horn, and there was great
confusion for a time as few could find their gas helmets.
About the middle of June the Battalion started work in Thiepval Wood,
digging assembly trenches off Elgin Avenue. There it was sometimes
annoyed by shelling, and a few casualties were suffered. On June 24th
the work came to an end and the Battalion moved back, taking with it
the thanks and congratulations of the G.O.C., 36th Division, under whom
it had been working.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account