1040, then, is a recognised date to which we can refer the earliest work
at Stow. We know, too, that a church was founded at Alkborough in 1052,
and the work in the western tower there, with its triangular-headed
belfry windows, may be claimed for that date or not long after. These
are practically the only two pieces of dated evidence on which we can
rely, for we have already seen that the evidence as to Coleswegen’s
churches at Lincoln does not apply to existing buildings.[42] Stow, as
we have seen, retains strip-framing to the tower jambs on a large scale:
“long-and-short” work occurs in the north transept doorway and in the
jambs of a window opening in the south transept: through-stone masonry
is used in the north transept doorway, but abandoned in the tower arch
jambs. Alkborough has none of these characteristics. We are thus at
liberty to assume a gradual cessation of purely Saxon technique between
1040 and 1052.
Further, at Barton-on-Humber, although we have no documentary evidence
to guide us, it is obvious that the tower is of two styles. The uppermost
stage forms an addition to the original design in a somewhat more
simple style. An interval of date between the stages is certain: the
length of that interval would be hard to ascertain. But the fantastic
strip-panelling and “long-and-short” work of the lower stages of the
tower belong to the height of a fashion in architecture which is seen
gradually disappearing at Stow. The strip-framing and “long-and-short”
work at Stow are of a different and less purely decorative type: we are
not surprised when in the upper stage of the tower at Barton, or in
the tower at Alkborough, they disappear altogether. So far, then, this
statement of progress is justifiable. The lower stages of the tower at
Barton are obviously earlier than the upper stage. The upper stage has
affinities of detail with the tower at Alkborough, and clearly belongs
to much the same or a slightly later period. The tower at Alkborough
is at least twelve years later than the only trustworthy date for the
early work at Stow. And, as we have just seen, the work at Stow, in
its selection and treatment of elements which had been used at Barton
in careless profusion, is probably later in date than the earlier
portion of Barton. With Barton may be grouped, from the character of its
“long-and-short” quoining and the window-openings of its stair turret,
the interesting tower at Hough-on-the-Hill. With Stow we may group,
at any rate provisionally, those fabrics which have “long-and-short”
quoining of a substantial type, flush with the surface of the wall,
instead of projecting in rather thin strips beyond it—this will include,
as we have noticed, some naves of churches. With Alkborough and the
upper stage at Barton can be combined church towers generally, Hough
alone excepted, and work of a partly Saxon character, like that at
Stragglethorpe, not far from Hough. The “long-and-short” work in Rothwell
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account