The tracks they were to lay for America, though they were far enough
from the Flanders mud, had a sort of their own to offer. The terminal
was built by tremendous preliminaries with the suction-dredge. The long
lines of communication between camp and sea were varyingly difficult,
some of them offering nothing to speak of, some of them abominable. The
little spur railways leading to the hospitals, warehouses, and
subsidiary training-camps which lay afield from the main line were more
quickly done.
In addition to all these things, the engineers were the handy men of
France. They picked up some of the versatility of the Regular Army
engineers, whose accomplishments are never numbered, and they built
hospitals and barracks, too, in spare time, and they laid waterways, and
helped out in General Pershing's scheme to put the inland waterways of
France to work. The canal system was finally used to carry all sorts of
stores into the interior of France, and before the engineers were
finished the army was getting its goods by rail, by motor, and by boat,
though it was not till late in the year that the transportation
machinery could avoid great jams at the port.
The engineers were, from first to last, the most picturesque Americans
in France. They came from the great yards and terminals of East and
West, they brought their behavior, their peculiar flavor of speech, and
their efficiency with them, and they refused to lose any of them, no
matter what the outside pressure.
"It's a great life," said one of them from the Far West, "and I may say
it's a blamed sight harder than shooing hoboes off the cars back home.
But there's times when I could do with a sight of the missus and the
kids and the Ford. If it takes us long to lick 'em, it won't be my
fault."
CHAPTER XIII
BEHIND THE LINES
The difficulty of describing the American organization behind the lines
in France lies in the fact that the story is nowhere near finished. The
end of the first year saw huge things done, but huger ones still in the
doing, and the complete and the incomplete so blended that there was
almost no point at which a finger could be laid and one might say: "They
have done this."
But at the end of the first year all the foundations were down and the
corner-stones named, and though much necessary secrecy still envelops
the actual facts, something at least can be told.
America could no more move direct from home to the line in the matter of
her supplies than she could in that of her men. And it was at her
intermediate stopping-point, in both cases, that her troubles lay. It
was, as Belloc put it, the problem of the hour-glass. Plenty of room at
both ends and plenty of material were invalidated by the little strait
between.
It was not a month from the time of the first landing of troops, in
June, 1917, before the wharfs of the ports chiefly used by incoming
American supplies were stacked high with unmoved cases.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account