Our national forests : $b a short popular account of the work of the United States Forest service on the national forestsBoerker, Richard H. D. (Richard Hans Douai)
History
Our national forests : $b a short popular account of the work of the United States Forest service on the national forests
Boerker, Richard H. D. (Richard Hans Douai)
Forests and forestry -- United States; United States. Forest Service
The need for new roads and trails depends upon the number of them
already existing, the value of the resources that it is necessary to
make accessible, the fire liability, and the amount of unrealized
revenues due to lack of transportation facilities. If valuable
grazing land or timber land can be made accessible there is good reason
for building a new road. In many cases roads and trails are built to
facilitate the protection of large remote areas from fire. Such areas
may have large bodies of valuable timber which if destroyed by forest
fires would involve a heavy loss. Even aside from valuable timber on
an area, it is absolutely necessary when a forest fire breaks out to
get to it with men and fire-fighting equipment in the shortest possible
time before it spreads. If the fire gets to be a large one, many men
with provisions, tents, fire-fighting tools, and other equipment must be
transported to the scene of the fire. Any delay in the transportation
of these things may prove fatal and may result in an uncontrollable
conflagration.
The transportation system that is proposed for a National Forest, if the
one that exists is inadequate, is usually planned many years ahead. The
ultimate or ideal system is always kept in mind so that every mile of
road or trail that is constructed is made a part of it. If not enough
money is available for a good road, a trail is built along the line of
the proposed road. Later this trail is widened into a permanent road.
The Engineer connected with each District Office usually has charge of
laying out big road projects. A few miles of permanent, good, dirt road
with good grade is always preferred to many miles of poor road with
heavy grade and improper drainage. A road and trail system is planned
for each National Forest which will eventually place every portion of
the Forest within a distance of at least 7-1/2 miles of a wagon road. A
pack-train can then transport supplies from the point to which they are
delivered on the wagon road to any field camp and return in a single day.
In trail and road construction it is very often necessary to build
bridges. Sometimes a very simple log bridge meets the need, but in
bridging many large mountain torrents, which become very high and
dangerous in the spring, large bridges are necessary. Cable suspension
bridges and queen and king truss bridges are built where occasion arises
for them, but only after being planned in detail and after the District
Forester has approved their design and method of construction.
[Illustration: Figure 14. A typical Forest ranger's headquarters.
Idlewood Ranger Station, Arapaho National Forest, Colorado]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account