Scientific American Supplement, No. 455, September 20, 1884Various
Science
Scientific American Supplement, No. 455, September 20, 1884
Various
Science -- Periodicals
WATER-POWER WITH HIGH PRESSURES AND WROUGHT-IRON WATER-PIPE.
By HAMILTON SMITH, JR., M. Am. Soc. C.E.
METHODS OF CONDUCTING WATER AND TRANSMITTING POWER.
A description of the mode of using water-power for driving the North
Bloomfield tunnel in California, some years since, will give a good
illustration of some of the advantages of the hurdy-gurdy. This tunnel was
originally about 8,000 feet long, through a slate highly metamorphosed,
with its general line passing under a good-sized stream, at a depth of
about 190 feet. There were eight working-shafts, each about 200 feet deep,
which, with the lower entrance or portal, gave sixteen working faces.
Diamond drills were used at the lower heading requiring power; the other
fifteen headings were driven by hand-work. It was uncertain how much water
would be encountered; but from the location, it was evident that a large
quantity might be struck in any shaft, and hence it became necessary to
have ample power at hand at each opening, in readiness for such an
emergency. A pipe main was laid along the general line of the tunnel, with
its pen-stock 285 feet vertical above the surface at the upper shaft, and
549 feet above the lowest shaft. It was made of single riveted sheet-iron,
of No. 14 (Birmingham) gauge, in lengths of 20 feet, put together
stove-pipe fashion, with the joints made tight by cloth tarred strips and
pine wedges. This pipe had a diameter of 15 inches at the pen-stock,
diminishing from this to 13, 11, and 7 inches at its lower end. From it,
short branches, 7 inches in diameter, were extended to the several shafts.
It was in one place carried across the stream by a light suspension
bridge, some 150 feet long, the trunk of a tree on each side forming a
convenient tower. The aggregate length of the main and branches was 9,960
feet, with some 2,500 feet additional, for the branch to the diamond
drills. The pipe was laid on the surface of the ground, its only
protection being in places a couple of 1½-inch planks tacked together, and
placed over it; the range of temperature was from 10 degrees to 107
degrees Fahr. (in the shade). It was inspected by the foreman of the
tunnel-work as he daily walked over the line; besides the occasional
driving of a few wedges and putting on a band or two, it gave no trouble
from leakage, which probably for its entire length did not amount to more
than an average of 3 or 4 cubic feet a minute; from time to time, a little
sawdust was put into the pen-stock. Three stop-gates were placed on the
main, and a separate stop-gate at each shaft, operated by a fine-threaded
screw, so that the water could be cut off when desired.
[Illustration: FIG. 13.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account