This excellent result was attained by careful calculations and
experiments with perpendicular wires kept in position by weights,
which, to avoid oscillation, were suspended in buckets of water. From
shaft to shaft the tunnel is 1,770 yards in length and 26 feet in
diameter; but for a length of 400 feet at the James Street and
Hamilton Square stations the arch is enlarged to 501/2 feet. The tunnel
is lined with from six to eight rings of solid brickwork embedded in
cement, the two inner rings being blue Staffordshire or Burnley
bricks. For the purpose of ventilation a smaller tunnel, 7 feet in
diameter, was bored parallel with the main tunnel, with which it is
connected in eight places by cross cuts, provided with suitable doors.
Both at Liverpool and at Birkenhead there are two guibal fans, one 40
feet and the other 30 feet in diameter. The smaller, which throw each
180,000 cubic feet of air per minute, ventilate the continuations of
the tunnel under Liverpool and Birkenhead respectively, and the larger
tunnel under the river. The fans remove together 600,000 cubic feet of
air per minute, and by this combined operation the entire air in the
tunnel is changed once in every seven minutes. By the use of
regulating shutters the air passes in a continuous current and the
fans are noiseless. The telegraph and telephone wires pass through the
tunnel, thus avoiding the long detour by Runcorn. Probably, as a feat
of engineering, the construction of the new station at Bold Street is
not inferior to any part of the scheme advanced. Under very singular
and perplexing difficulties it could only be proceeded with in its
first stages from midnight until six o'clock the following morning, it
being of course essential that the traffic at the Central Station
should not be interfered with. During these hours, night after night,
trenches were cut at intervals of 10 feet across the roadway
connecting the arrival platforms at the station, and into these were
placed strong balks of timber, across which planks were laid as a
temporary roadway. Beneath these planks, which were taken up and put
down as required, the rock was excavated to a depth of 9 feet, and the
balks supported upon stout props. Then from the driftway or rough
boring beneath well holes were bored to the upper excavation, and
through them the strong upright iron pillars designed to support the
roof of the new tunnel station were passed, bedded and securely fixed
in position. No sooner were they _in situ_ than the most troublesome
part of the task was entered upon, for the balks had then to be
removed in order to allow to be placed in position the girders running
the length of the new station, and resting on the tops of the upright
pillars. From these longitudinal girders cross girders of great
strength were placed, and between these were built brick arches,
packed above with concrete. This formed the roof of the new station.
One portion of it passed under the rails in the station above, and had
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account