+-----------+------+-------+---------++------+-------+----------+ |SEE | 1 | .4 | 10. || 1 | .7 | 20. | |REGULATIONS| 1 | .4 | 11. || 1 | .4 | 11. | | FOR SAME. | 1 | 1.2 | 25. || 1 | 2.2 | 49. | +-----------+------+-------+---------++------+-------+----------+ INDEX. After guy—ship‘s torpedo spar, 16 Alkaline solution, 45 Amount of water in wet gun-cotton, 44 Apparatus for drying gun-cotton, 13, 47, 48, 49 Articles for testing gun-cotton. (See Chemical box). ” list of in outfit, 52 ” of torpedo outfit supplied at Navy Yard, 15, 56 ” ” ” ” ” from Torpedo Station, 14, 52 ” spare, 1, 14 Bands, spar, 8, 53 Batteries, firing. (See Firing-batteries). Battery-cell, description, 27 ” cells, spare, 27, 55 ” locker, 51 ” tester, 28, 55 Blocks, detonator, 11, 53 ” primer, dry, 12, 39, 40, 41, 49, 53 Boat, firing-batteries. (See Firing-batteries). ” fittings, Pattern B, 8, 9, 10, 54, 55 ” spar. (See Spar). ” to test the circuit from, 21 ” wire-box, 7, 54 Bow-fittings, 8, 54 Box, chemical, 13, 54 ” gunpowder fuzes and igniters, 12, 53 ” reel, 6, 52 ” stuffing, 3 ” supply, 8, 52 ” torpedo packing, 39 ” wire, boats, 7, 54 ” ” ships, 6, 7, 53 Butts, secondary spar, 5, 54 Cable, insulated. (See Reel box). Caps, secondary spar, 5, 54 ” ” ” rivets for, 54 ” water. (See Stuffing-boxes). Care and management of firing-batteries, 29 ” of gun-cotton and detonators, 41 Case, primer. (See Primer-case). Cell, battery, 27 Cells, battery, spare, 27, 55 Charge, detonator, 10, 42 ” primer, dry. (See Primer charge). Calcium, chloride. (See Chloride of calcium). Chemical box, 13, 54 Chloride of calcium, 47 ” ” ” how distinguished from chloride of lime, 47 ” ” ” test of, for bleaching properties, 47 ” ” ” to be used instead of chloride of lime, 47 ” ” lime. (See Chloride of calcium). Circuit-closer, Pattern B, description, 4 ” ” ” ” how attached, 4, 22 ” ” ” ” test, 22, 23 ” ” ” ” necessary to be water-tight, 23 ” ” ” ” number issued, 4, 56 ” ” ” ” safety-pin to be in before priming, 23 ” ” ” ” to be tested before priming, 23 ” ” safety-pins, spare, 53 ” ” spring, spare, 53 ” ” weight of, 5 Circuit testing, from ships, 20 ” to test the, from boats, 21 Clamps, spar, 10, 54 Cloth, emery, 52 Commanding officer of vessel to be furnished with plan of wires, 52 Condition of firing-batteries, how to test, 28, 29
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account