Officer commanding vessel to be furnished with plan of wires, 52 Okonite tape, 18, 52 Open-end wrench, 52 Outfit, spar-torpedo, amount of gun-cotton in, 40 ” ” articles of, invoice number of boxes containing, 57 ” ” ” ” list of, 52 ” ” ” ” place of stowage, 57 ” ” ” ” spaced occupied when boxed, 57 ” ” ” ” supplied at Navy Yards, 14, 56 ” ” ” ” from Torpedo Station, 48 ” ” ” ” weight of when boxed, 57 ” ” how designated, 1 ” ” includes, 1 Packing, spherical rubber, 3, 53, 56 Paper fasteners, 53 Permanent wires, 14, 56 ” ” plan to be furnished to, 52 ” ” use of, 25 Pins, safety, for circuit-closer, spare, 53 ” ” ” ” ” to be in before priming, 23 ” torpedo, 5, 55 ” ” spare, 55 Plate, testing and firing, 53, 56 Plates, earth, 52 Plyers, cutting, 52 Precautions to be taken in inspection of gun-cotton, 44 Preparation of contact torpedo, 22 ” ” exercise ” pattern D, 22 ” ” service ” ” ”, 17 Primer blocks, 12, 39, 40, 41, 53 ” case, description of, 2 ” charge, 40, 41 ” not to remain long in exercise torpedo, 22 ” dry gun-cotton, care of, 41 ” ” ” ” how packed and stowed, 12, 39, 41 ” ” ” ” inspection of, 42 ” ” ” ” number furnished, 41, 42 ” ” ” ” precautions to be observed with, 42, 44 ” ” ” ” testing. (See Inspection of gun-cotton). ” wet ” ” how packed, 39 Priming the exercise torpedo, 22 ” ” service torpedo, 17 Priming, wet gun-cotton removed in, where stowed, 17, 22 Rectifier, 19, 52 Reel box, 6, 52 Reeving-lines, 20, 53 ” line weights, 20, 53 Resistance of detonator bridge, 11 Rivets for secondary spar butts, 54 ” ” ” ” caps, 54 Rubber diaphragms, 4, 56 ” packing, spherical, 3, 53, 56 ” tubing, 38, 52 ” washers, 2, 56 Rules for drying gun-cotton, 45
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account