The execution of work within a deep pneumatic caisson is worth a
moment's consideration. Just above the surface of the water is a
busy force engaged in laying the solid blocks of masonry which are
to support the structure. Great derricks lift the stones and lay
them in their proper position. Powerful pumps are forcing air,
regularly and at uniform pressure, through tubes to the chamber
below. Occasionally a stream of sand and water issues with such
velocity from the discharge pipe that, in the night, the friction
of the particles causes it to look like a stream of living fire.
Far below is another busy force. Under the great pressure and
abnormal supply of oxygen they work with an energy which makes it
impossible to remain there more than a few hours. The water from
without is only kept from entering by the steady action of the
pumps far above and beyond their control. An irregular settlement
might overturn the structure. Should the descent of the caisson
be arrested by any solid under its edge, immediate and judicious
action must be taken. If the obstruction be a log, it must be cut
off outside the edge and pulled into the chamber. Boulders must be
undermined and often must be broken up by blasting. The excavation
must be systematic and regular. A constant danger menaces the lives
of these workers, and the wonderful success with which they have
accomplished what they have undertaken is entitled to notice and
admiration.
[Illustration: Pier of Hawkesbury Bridge, Australia.]
Another process, which has succeeded in carrying a foundation to
greater depths than is possible with compressed air, is by building
a crib or caisson, with chambers entirely open at the top, but
having the alternate ones closed at the bottom and furnished with
cutting edges. These closed chambers are weighted with stone or
gravel until the structure rests upon the bottom of the river;
the material is then excavated from the bottom through the open
chambers, by means of dredges, thus permitting the structure
to sink by its weight to the desired depth. When that depth is
reached, the chambers which have been used for dredging are filled
with concrete, and the masonry is constructed upon the top of this
structure. The use of this system has enabled the engineer to place
foundations deeper than has been accomplished by any other device,
one recently built in Australia being 175 feet below the surface of
the water. The illustrations above and on page 76 show this method
of construction.
[Illustration: Foundation Crib of the Poughkeepsie Bridge.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account