When the junction was made at the centre of the middle span, the
trusses were continuous from bluff to bluff, and, had they been
left in this condition, would have been subjected to constantly
varying strains resulting from the rise and fall of the iron piers
due to thermal changes. This liability was obviated by cutting the
bottom chords of the side spans and converting them into sliding
joints at points 75 feet distant from the iron piers. This done,
the bridge consists of a continuous girder 525 feet long, covering
the middle span of 375 feet, and projecting as cantilevers for 75
feet beyond each pier, each cantilever supporting one end of a
300-foot span, which completes the distance to the bluff on each
side.
[Illustration: The Niagara Cantilever Bridge in Progress.]
A most interesting example of cantilever construction is the
railway bridge built several years ago at Niagara, only a few rods
from the suspension bridge and a short distance below the great
falls. It is shown in the illustrations above and on page 91. The
floor of the bridge is 239 feet above the surface of the water,
which at that point has a velocity in the centre of 16½ miles per
hour and forms constant whirlpools and eddies near the shores.
The total length of the structure is 910 feet, and the clear span
over the river between the towers is 470 feet. The shore arms of
the cantilever, that is to say, those portions of the structure
which extend from the top of the bank to the top of the tower built
from the foot of the bank, are firmly anchored at their shore
ends to a pier built upon the solid rock. These shore-arms were
constructed on wooden false works, and serve as balancing weights
to the other or river arms of the lever, which project out over
the stream. These river-arms were built by the addition of metal,
piece by piece, the weight being always more than balanced by
the shore-arms. The separate members of the river-arms were run
out on the top of the completed part and then lowered from the
end by an overhanging travelling derrick, and fastened in place
by men working upon a platform suspended below. This work was
continued, piece by piece, until the river-arm of each cantilever
was complete, and the structure was then finished by connecting
these river-arms by a short truss suspended from them directly
over the centre of the stream. This whole structure was built in
eight months, and is an example both of a bold engineering work
and of the facility with which a pin-connected structure can be
erected. The materials are steel and iron. The prosecution of this
work by men suspended on a platform, hung by ropes from a skeleton
structure projecting, without apparent support, over the rushing
Niagara torrent, was always an interesting and really thrilling
spectacle.
[Illustration: The Niagara Cantilever Bridge Completed.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account