The animated scene presented by these operations was highly interesting
from the number of men employed, both on the ground and for fixing the
trusses in their position aloft, and from the rapid progress so many hands
made. Each gang of men was managed by a foreman, who was obliged to issue
his orders through a speaking-trumpet, to enable his voice to be heard in
the din caused by the other works going on around. Besides the two large
gangs of men engaged in the hoisting of the trusses, other smaller gangs
were at work at different points getting up the columns and girders. In one
part, the roofing of which was completed as early as practicable, a crowd
of carpenters were preparing the Paxton's gutters and other portions of the
work. In another place, as soon as a sufficient space could be roofed over
and a temporary floor laid, various parts of the machinery we have already
described were fitted up and worked by portable steam-engines. Of these
there were three in different parts: one drove the machinery for finishing
the sash-bars, gutters, ridges, &c.; another worked the drilling, punching,
and other machinery connected with the iron-work; and a third was used for
working circular saws.
Of the number of trusses that were hoisted as above described, in only one
instance (and that the first) was the result otherwise than perfectly
successful. The first truss was raised by its ends, instead of from the
centre; but that method was afterwards abandoned, from the difficulty of
maintaining the truss in an upright position during its ascent; which was
important, as, if it turned on its side, its lateral strength was not
sufficient to prevent it from bending, which would have destroyed the
joints of the work.
One of the tall masts was worked on each side of the transept, from the
centre to the ends of the building, being maintained constantly in an
upright position, while traversing from point to point, by alternate
slackening and hauling up of the ropes which steadied it; and it was
curious to witness the motion of these tall giants, as they slowly
progressed from one point to another, in the performance of their important
office. Stout planks were laid along the ground, upon which the foot of the
mast was forced forward by crowbars and levers; the planks served also to
distribute the weight, which would otherwise have sunk the end into the
ground. As many as seven trusses were hoisted in one day by each derrick,
which had therefore to travel a distance of 168 feet.
So careful were the men, under the direction of the manager (to whom was
intrusted the active superintendence of the whole erection of the
building), that no accident of importance occurred in these difficult
operations.
[Illustration: HOISTING THE 72-FEET TRUSSES.]
Provision for Expansion of Girders.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account