"The operation about which most anxiety had been felt was the hoisting of
the arched ribs of the transept. These ribs were constructed on the ground
horizontally, and when completed with all their bolts, two of them were
reared on end, and maintained in a vertical position, at a distance of
twenty-four feet from each other, by guy-ropes. As the ribs singly
possessed little lateral stiffness, they were framed together in pairs with
the purlins, intermediate small ribs and diagonal tie-rods, forming a
complete bay of the roof twenty-four feet long; two complete sets of
temporary ties were also introduced to provide for the strains incident to
the variations in position of the ribs during the hoisting. The feet of the
ribs were bolted on to a stout piece of timber, and the lower purlins
strutted up from the same." In this state the framework is shown in the
engraving.
[Illustration: A PAIR OF RIBS PREPARED FOR RAISING.]
"The whole framework was then moved on rollers to the centre of the square
formed by the intersection of the transept and the main avenue, where it
was afterwards hoisted. All the ribs were landed over this square, and were
afterwards moved on a tramway formed of a half baulk of timber constructed
over the columns on either side of the transept, at a height of about four
feet above the lead-flat. The hoisting-tackle consisted of four crabs, each
one being placed on the side of the transept opposite to the part of the
ribs to be lifted by it, so that the men at the crabs might watch the
effect of their exertions with greater convenience."
"The hoisting-shears were placed on the lead-flat immediately over the deep
trusses of seventy-two feet span; each set consisted of three stout
scaffold-poles, lashed together at the top, and footed on planks laid
across the flat, and secured by the necessary guy-ropes. The hoisting-rope
passed from each of the crabs across the transept horizontally, to a
leading block attached to the foot of the opposite angle column of the
square; it then passed up to a treble block fastened to the shears on the
flat, and from thence down to a double block secured by chains to the
bottom part of the ribs."
[Illustration: Hoisting the Ribs for the Transept Roof.]
"There was a peculiar difficulty to be overcome in this operation, which
arose from the circumstance that the width of the framework was greater
than that of the transept, the extreme width of the framework to be hoisted
being seventy-four feet, and the clear width apart of the trusses above
which it had to be hoisted being only seventy-one feet four inches. It was
therefore necessary to raise one side to a height of thirty-five feet
before raising the other, so as to diminish the horizontal width of the
whole, the diameter of the semicircle being maintained at this angle; the
whole was then hoisted, until the highest end could clear the tramway."
This accounts for the slanting position in which the ribs are shown in the
view given.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account