Five lines of stakes were now driven into the ground from the eastern to
the western boundaries of the state of New York--a circumstance which
must be considered epoch-making in the history of America. For, look at
it as you will, the beginning of the Erie Canal must be considered a
greater marvel than the building of it. It would be difficult now to
propose an engineering feat that is within the range of sanity that
would provoke so much ridicule and debate as did the plan to build the
Erie Canal through those hundreds of miles of dense forests and reeking
swamps in 1816. A bridge across the Atlantic or a tunnel underneath it
could scarcely provoke more sneers today. Yet the summer of 1817 saw the
rows of stakes driven into the ground--over hill and vale, through
densest forest and sickliest swamp, from east to west; the outer rows
were sixty feet apart and indicated the space to be grubbed; between
these were two other rows forty feet apart which indicated the exact
dimensions of the canal; a single row of stakes in the middle marked the
exact center of the canal. Those who laughed at the stakes grew sober
when men came on over the route boring with four inch augers into the
ground every few rods to a depth of twelve feet; by this means the
nature of the soil was tested all along the route and estimates could be
made of the cost of the digging; thereupon profiles could be drawn by
the engineers. Each of the three great sections of the canal was
subdivided into very small sections which were to be let to contractors;
each working section was bounded, when possible, by a brook or ravine,
in order that each contractor might have the advantage of independent
drainage. The plan of the state's furnishing the tools for the work of
digging the canal was soon changed, the contractors being expected to
furnish their own tools. An instance of the skill of the old Erie Canal
engineers, in a day when "surveying" was as loose a word as the
dictionary contained, is interesting: "While Benjamin Wright, Esquire,
was re-examining and laying off sections from Rome, west along the canal
line, it was deemed expedient, as a test to the accuracy of the work,
that James Geddes, Esquire, should start, at a given point on the canal
line at Rome, and carry a level along the road to the east end of Oneida
Lake, marking on permanent objects the height of the surface of the
water while the lake was tranquil, at various places from the east to
the west end, along its southern shore; that he should then connect by a
level, the Oneida with the Onondaga Lake; after which he was to carry a
level from the last mentioned lake, at Salina, south about one and a
fourth miles to the canal line, and from thence to work to the east,
laying off sections along the canal line. This was accomplished, and
nine miles at the west end of the summit level were laid out into
sections. And the commissioners have the satisfaction to state, that
when the level of Mr.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account