The Great Frozen Sea: A Personal Narrative of the Voyage of the "Alert"Markham, Albert Hastings, Sir
History
The Great Frozen Sea: A Personal Narrative of the Voyage of the "Alert"
Markham, Albert Hastings, Sir
Alert (Sloop : 1856-1895); Arctic regions; Nares, George S. (George Strong), 1831-1915
The process of docking is rendered necessary to prevent a ship from
being crushed between two floes should she be so unfortunate as to be
placed between them with the whole force of the pack driving against the
outer one. This operation is frequently necessary whilst following the
land-ice, although in these days of steam it is not so frequently
practised as of old.
Our ice-saw crews had previously been organized, and, as it is
absolutely necessary that the work of construction should be carried out
with the utmost expedition, the whole of the officers and ship's company
were stationed so as to take an active part in the proceedings. The
instant the order was given for "all hands to cut dock" a most animated
scene ensued. Triangles were quickly erected, saws placed in position,
the dock measured and marked out by boarding-pikes placed at the several
corners, and every one working as if their lives depended upon their own
individual exertions. Three persons only were left on board the
ship--namely, one officer in charge of the deck, the engineer at the
engines, and a man at the helm--and, as it was necessary to keep the
ship constantly moving so as to avoid pieces of ice, and also to place
her in a good position for being docked, these three had no sinecure
offices.
Occasionally a jet of water, followed by a loud report and a shower of
fragmentary ice, showed that powder was used to shatter the larger
pieces of ice that had been cut, but unless great care is taken in the
use of this explosive, it is liable to damage the sides of the dock.
This was our first attempt at dock cutting, which will account for the
time occupied in its construction. Ordinarily the work should be
completed in about a couple of hours. When two or more ships are in
company time is saved by employing all hands to cut one dock large
enough to take in all the ships.
The diagram on next page will serve to illustrate the system employed by
us whilst engaged in making one of these docks. The last triangular
piece of ice that is taken out--namely, the portion marked on the plan
by the letters C B F--is removed intact, and being placed across the
entrance serves to close the dock and thus keep out all stray pieces of
ice.
After four hours of such work as dock cutting entails, it was poor
comfort for us to return on board wet, cold, and hungry, only to find
that our fires had been allowed to burn out, and that we could neither
get a cup of tea to refresh ourselves with, nor a chance of warming
ourselves at the stove.[1] The Eskimo dogs, being turned out on the floe
and tied to one of our anchor lines, made night hideous by their dreary
and lamentable wailing.
[Illustration: PLAN OF ICE DOCK.
No. 1 saw cuts from A to B 200 ft.
No. 2 " " D to C 200 ft.
No. 3 " " B to C 35 ft., and then on to F 115 ft.
No. 4 saw cuts from F to D 120 ft., and, if necessary, from E to F 48
ft.
DIMENSIONS OF DOCK.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account