The Invention of the Track Circuit: The history of Dr. William Robinson's invention of the track circuit, the fundamental unit which made possible our present automatic block signaling and interlocking systemsAmerican Railway Association
History
The Invention of the Track Circuit: The history of Dr. William Robinson's invention of the track circuit, the fundamental unit which made possible our present automatic block signaling and interlocking systems
There is no doubt but that track circuits were thought of and actually
experimented with in England a great many years ago--probably as far
back as the earliest American attempts--but the want of satisfactory
records make it very difficult to decide on what actually took place.
However, it is certain that the late W. R. Sykes, well-known
throughout the railway world for his controlled manual block and other
inventions, endeavored to use the track circuit in the sixties and
that Bull, the inventor of the bull-headed rail employed in England
for the chaired track universally found there, clearly had the idea of
a track circuit in his mind, for he refers to it in a patent obtained
in 1860. It was apparently in the early part of the sixties that W. R.
Sykes fixed a track circuit experimentally at Briseton on the old
London, Chatham and Dover Railway, and shortly after also at the
Crystal Palace Station on the same line. The apparatus employed must
necessarily have been rather primitive. In the seventies, track
circuit was installed by him at St. Paul's station, also on the
Chatham Railway. At that time very little was known about the track
circuit theoretically and the construction of the relay was very
different from our modern types. Sykes' relay completed the control
circuit by the insertion of a contact point into a mercury trough. It
was also, the writer believes, built on the solenoid principle. So far
as is known it was not suggested at this time and at all events not
attempted to make an automatic block system controlled by track
circuits, such schemes for signaling of this type as were put forward
being always based on the intermittent or track instrument control
plan.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account