The water-course of Suez follows the direction and even the bed of the
ancient canal, as far as the Serapeum, the culminating point of the bar
of that name; it then leaves the ancient canal to the east, to avoid the
sands, passes into a solid plain, makes the circuit of the grand basin of
the Isthmus, arrives at the narrowest part, and continues in the plain at
a sufficient height not to let the fresh water pass into the low and salt
lands.
If on the Pelusiac side, a conduit of water has been adopted instead of
an open water-course, it is in order to obtain fresh water more quickly
for the whole length of the Maritime Canal, and because the tillage on
the Pelusiac side does not begin until after that of Suez. And the pipes
when they shall be replaced hereafter by a water-course, will serve to
form a good distribution of water in the town which will arise at Port
Timsah.
The advantages of the undertaking are now demonstrated. But it is not
so with regard to the returns which it will give to the shareholders.
Doubt is prevalent in the financial world, in consequence of the widely
different estimates made by the engineers, both as to the cost and the
probable returns. We have therefore directed our investigations more
particularly to this capital point of the question, taking care to guard
against every kind of exaggeration, in order to arrive at accurate and
conscientious results, and at figures as near as possible to the truth.
We are now about to present the result of our investigations in this last
part of our labours.
ESTIMATE OF THE COST.
ARTICLE I.
EARTH-WORKS.
We have adopted in our calculations for the Canal, the depth of 6 _met._
50 below low water, which will give for the _minimum_ 7 _met._ 50, and
for the _maximum_ 8 to 9 _met._ draught of water, by the disposition of
the locks and the elevation of the tides of the Red Sea. If this figure
should not be found sufficient, it would be easy to increase it by the
dredging machines, a certain number of which will always be kept, and
which would not prevent the navigation of the Canal.
_met. cub._
The total quantity of removal required for the excavation
of the Grand Canal, according to the calculations made
from the sections, is 74,679,132
Of which the part to be excavated to the level of low
water in the Mediterranean is 17,473,790
----------
the remainder 57,205,342
is below this level.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account