Of the building of the Baltimore & Ohio, tunnel-construction formed an
early part, several paths being found across the steep profiles of the
Alleghanies. The Kingwood Tunnel, which B. H. Latrobe drove, was nearly a
mile long and the chief of these bores. But when the Hoosac Tunnel was
first proposed--piercing the rocky heart of one of the greatest of the
Berkshires--the country stood aghast. Four miles and a half of tunnel!
That seemed ridiculous away back in 1854, when the plan was first broached
and folk were not slow to say what they thought of such an absurd plan.
For twenty years it looked as though these scoffers were in the right--the
work of digging that monumental tunnel was a fearful drain on the treasury
of the commonwealth of Massachusetts, which was lending its aid to the
project. But the tunnel-diggers finally conquered--they almost always
do--and the Hoosac remains to-day the greatest of all mountain tunnels in
America. The system of continuous tunnels, by which the Pennsylvania
Railroad recently reached its terminal in New York, stretches from Bergen
Hill in New Jersey to Sunnyside, Long Island, a distance of some ten
miles. In fact the largest feature of recent tunnel-work in this country
has been in connection with terminal and rapid-transit development in the
larger cities. For a good many years New York and Baltimore, in
particular, have been pierced with these sub-surface railroads; it is a
construction feature that increases as our great cities themselves
increase. No river is to-day too formidable to be conquered by these
underground traffic routes. A river such as the Hudson or the Detroit may
sometimes halt the bridge-builders; it has but slight terror for the
tunnel engineers.
The tunnel-work is apt to be a separate part of the work of building a
railroad. It calls for its own talent, and that of an exceedingly expert
sort. If the tunnel is more than a half or three-quarters of a mile long
it will probably be dug from a shaft or shafts as well as from its
portals. In this way the work will not only be greatly hastened but the
shafts will continue in use after the work is completed as vents for the
discharge of engine smoke and gases from the tube. The work must be under
the constant and close supervision of resident engineers. The survey lines
must be corrected daily, for the tunnel must not go astray. It must drive
a true course from heading to heading. In the shafts plumb lines, with
heavy bobs, to lessen vibration, will be hung. Sometimes these bobs are
immersed in water or in molasses.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account