The Municipal and Sanitary Engineer's HandbookBoulnois, H. Percy (Henry Percy)
Science
The Municipal and Sanitary Engineer's Handbook
Boulnois, H. Percy (Henry Percy)
Municipal engineering; Sanitary engineering
_Carey’s Wood Pavement._--In this case the blocks are cut 4 inches wide
by 9 inches long, and 5 or 6 inches deep, according to the traffic;
these blocks are shaped with alternate convex and concave ends, and are
laid on a bed of sand about 2 inches thick, the joints between the
blocks, which have been left about ³⁄₈ inch wide, being filled with a
grouting of lime and sand.
_Messrs. Mowlem and Company’s_ method of laying wood paving is to form a
foundation of concrete, varying in thickness according to the nature of
the subsoil and the traffic; then to pave with blocks of yellow deal, 3
inches wide and 6 or 7 inches deep; the joints, which vary from ³⁄₈ to
¹⁄₂ inch, are filled in with sand and lias lime, and the surface is
afterwards indurated by strewing it with shingle.
_Patent Ligno-Mineral Paving Company._--This company lays claim to the
speciality of using hard woods as well as pine, and that the pine blocks
they employ are preserved or mineralised so as to be more durable than
the wood in its natural state.[71]
_Nicholson’s Wood Pavement._--This is principally in use in the United
States, and consists of rectangular blocks of pine laid upon a close
flooring of pine boards, 1 inch thick, laid lengthwise with the line of
street, their ends resting on similar boards laid transversely from kerb
to kerb, the boards being thoroughly tarred and laid upon a bed of sand.
The joints of the wood blocks are run with an asphaltic mixture, and the
whole surface is finally covered with hot coal tar and sprinkled with
fine sand and gravel.
_Stowe’s Wood Pavement._--This is also American, the blocks resting
directly upon sand or gravel about 6 inches in thickness.[72] “The
blocks are set in courses transversely across the street, so as to break
joint lengthwise of the street, the courses being separated from each
other 1 inch by a continuous course of wooden wedges placed close
together edge to edge, and extending from kerb to kerb. These wedges are
set in the first instance with their tops flush with the top surface of
the blocks. After the whole pavement shall have been well rammed, so as
to give each block a firm bed, the wedges are driven down about 3
inches, and the open joints thus formed above them between the courses
are filled in with a concrete composed of hot coal tar and fine roofing
sand and gravel. The surface of the pavement may then be coated with
coal tar prepared by boiling with pitch, and finished off with a thin
layer of sand.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account