The bridge consisted of a huge rectangular tube, similar to that
spanning the Menai Straits, carrying a single track. From end to end
it measured 6,592 feet by 16 feet wide, 18 feet in height, and weighed
9,044 tons. It was divided into 25 spans, 24 of which were of 242
feet each, while one was of 330 feet. The piers were built massively
in masonry, the stone being obtained from quarries in convenient
proximity. The ironwork was prepared in England, each piece being
marked carefully for its position in the structure. The bridge had
a gradual slope upwards from either bank to the centre, where the
height from the bed of the river to the top of the tube was 108 feet.
For its erection 2,250,000 feet of timber were required in connection
with the temporary work, the piers and abutments demanded the use of
some 3,000,000 feet of masonry, and 2,500,000 rivets were used to
secure the component parts of the ironwork together. In addition to
the bridge proper, some 2,500 feet of approaches on either side had
to be fashioned, so that the total length of the work was 9,144 feet.
The contracted price for the structure was £1,400,000, or $7,000,000,
but it was completed for £100,000 ($500,000) less. Of this total the
masonry and temporary work absorbed,£800,000, or $4,000,000, and the
ironwork £400,000 ($2,000,000).
[Illustration: A VIEW OF THE IRON TUBE, 2,290 FEET IN LENGTH AND 23
FEET IN DIAMETER]
[Illustration: THE 2000 H.P. ELECTRIC LOCOMOTIVES HAULING THE
“INTERNATIONAL LIMITED” THROUGH THE TUBE
The “link that binds Two Great Nations,” the St. Clair Tunnel, under
the St. Clair River.]
While the work was in progress the railway company found increasing
traffic, as the sections of completed line were opened, so emphasised
the urgency of securing through communication across the river that
the contractors were approached, and a bonus of £60,000 ($300,000) was
offered to them if they would complete the work a year earlier than was
stipulated in the contract. The engineers redoubled their efforts, and
on December 17, 1859, the great bridge was opened, though the official
ceremony took place five months later, when King Edward VII, then
Prince of Wales, opened the Victoria Bridge, as it was christened, in
the name of Queen Victoria, during his visit to the Dominion.
Stephenson died before his great work was completed. For a quarter of a
century or more it constituted one of the sights of the North American
continent. As the country became more settled and the volume of traffic
flowing to and fro across the river increased, the railway experienced
a very great difficulty in handling it over a single line. At last the
inadequacy reached such a point that some improvement was imperative.
A second bridge would have been too costly, and after considerable
reflection it was decided to replace the tubular bridge by one of
larger dimensions.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account