The invitation for tenders was awaited with keen anticipation
throughout the world, as it was conceded to offer a unique opportunity
to the electrical engineer. Consequently keen competition was evinced
to secure the honour of carrying out such a remarkable undertaking.
The contract was secured by the Westinghouse Electric & Manufacturing
Company, and was carried to a successful conclusion at a cost of
£100,000 ($500,000). The locomotives now used on this service are
among the most powerful in the world. They weigh 135 tons, and develop
about 2000 horse-power, which enables them to haul a 1000-ton train
up the heavy approach grades at a minimum speed of 10 miles per hour.
Moreover, since electricity was adopted, the tunnel has been kept free
from the dense clouds of smoke and steam which originally converted the
tube into a veritable inferno, and, what is far more important from the
railway company’s point of view, the electrical system is able to meet
three times the volume of traffic that exists to-day, so that there is
ample provision for the future. As it is, the 2¼ miles of line beneath
the teeming St. Clair River is the heaviest electrically worked section
of railway in the world.
Another link with the United States, however, was incumbent to bring
the manufacturing centres around Buffalo into closer communication
with the Dominion. Yet there was only one point where this link could
be provided--across the gorge through which the Niagara River, after
tumbling over the lofty cliff, seethes and boils on its way to Lake
Ontario. A suspension bridge met the exigencies of highway traffic for
some years, but here again improvement was demanded. Accordingly, a
new bridge was planned, and this constitutes one of the most graceful
structures spanning that fearful rift.
The old bridge fulfilled its services faithfully for forty years, and
when demolished was found to be possessed of several years of life. The
new bridge is a splendid work, and its close proximity to the Falls
offers a striking comparison between the handiwork of Nature and that
of the engineer. The bridge leaps across the gorge in a single span,
and when one is speeding over the structure in the train, one is at an
elevation of 226 feet above the raging waters below. The span is of no
less than 550 feet, and the ends are secured to massive anchorages sunk
into the face of the cliffs. It is wrought throughout of steel, and
is approached from either side over a single truss span 115 feet long,
giving a total length of 780 feet.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account