The Sewerage of Sea Coast TownsAdams, Henry Charles
Science
The Sewerage of Sea Coast Towns
Adams, Henry Charles
Sewerage
Unless it is permissible for the sewage to have a free outlet
to the sea at all states of the tide, the provision of
effective storm overflows is a matter of supreme importance.
Not only is it necessary for them to be constructed in well-
considered positions, but they must be effective in action. A
weir constructed along one side of a manhole and parallel to
the sewer is rarely efficient, as in times of storm the liquid
in the sewer travels at a considerable velocity, and the
greater portion of it, which should be diverted, rushes past
the weir and continues to flow in the sewer; and if, as is
frequently the case, it is desirable that the overflowing
liquid should be screened, and vertical bars are fixed on the
weir for the purpose, they block the outlet and render the
overflow practically useless.
Leap weir overflows are theoretically most suitable for
separating the excess flow during times of storm, but in
practice they rarely prove satisfactory. This is not the fault
of the system, but is, in the majority of the cases, if not
all, due to defective designing. The general arrangement of a
leap weir overflow is shown in Fig. 17. In normal circumstances
the sewage flowing along the pipe A falls down the ramp, and
thence along the sewer B; when the flow is increased during
storms the sewage from A shoots out from the end of the pipe
into the trough C, and thence along the storm-water sewer D. In
order that it should be effective the first step is to
ascertain accurately the gradient of the sewer above the
proposed overflow, then, the size being known, it is easy to
calculate the velocity of flow for the varying depths of sewage
corresponding with minimum flow, average dry weather flow,
maximum dry weather flow, and six times the dry weather flow.
The natural curve which the sewage would follow in its downward
path as it flowed out from the end of the sewer can then be
drawn out for the various depths, taking into account the fact
that the velocity at the invert and sides of the sewer is less
than the average velocity of flow. The ramp should be built in
accordance with the calculated curves so as to avoid splashing
as far as possible, and the level of the trough C fixed so that
when it is placed sufficiently far from A to allow the dry
weather flow to pass down the ramp it will at the same time
catch the storm water when the required dilution has taken
place. Due regard must be had to the altered circumstances
which will arise when the growth of population occurs, for
which provision is made in the scheme, so that the overflow
will remain efficient. The trough C is movable, so that the
width of the leap weir may be adjusted from time to time as
required. The overflow should be frequently inspected, and the
accumulated rubbish removed from the trough, because sticks and
similar matters brought down by the sewer will probably leap
the weir instead of flowing down the ramp with the sewage. It
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account