The Sewerage of Sea Coast TownsAdams, Henry Charles
Science
The Sewerage of Sea Coast Towns
Adams, Henry Charles
Sewerage
The greater the height of the tower which carries the mill the
greater will be the amount of effective wind obtained to drive
the mill, but at the same time there are practical
considerations which limit the height. In America many towers
are as much as 100 ft high, but ordinary workmen do not
voluntarily climb to such a height, with the result that the
mill is not properly oiled. About 40 ft is the usual height in
this country, and 60 ft should be used as a maximum.
Mr. George Phelps, in a paper read by him in 1906 before the
Association of Water Engineers, stated that it was safe to
assume that on an average a fifteen miles per hour wind was
available for eight hours per day, and from this he gave the
following figures as representing the approximate average duty
with, a lift of l00 ft, including friction:--
TABLE NO. 14
DUTY OF WINTDMILU
Diameter of Wheel.
10
12
14
16
18
20
25
30
35
40
The following table gives the result of tests carried out by
the United States Department of Agriculture at Cheyenne, Wyo.,
with a l4 ft diameter windmill under differing wind
velocities:--
TABLE No. 15.
POWER or l4-rx WINDMILL IN VARYING WINDS.
Velocity of Wind (miles per hour).
0--5 6-10 11-15 16-20 21-25 26-30 31-35
It will be apparent from the foregoing figures that practically
the whole of the pumping for a small sewerage works may be done
by means of a windmill, but it is undesirable to rely entirely
upon such a system, even if two mills are erected so that the
plant will be in duplicate, because there is always the
possibility, although it may be remote, of a lengthened period
of calm, when the sewage would accumulate; and, further, the
Local Government Board would not approve the scheme unless it
included an engine, driven by gas, oil, or other mechanical
power, for emergencies. In the case of water supply the
difficulty may be overcome by providing large storage capacity,
but this cannot be done for sewage without creating an
intolerable nuisance. In the latter case the storage should not
be less than twelve hours dry weather flow, nor more than
twenty-four. With a well-designed mill, as has already been
indicated, the wind will, for the greater part of the year, be
sufficient to lift the whole of the sewage and storm-water,
but, if it is allowed to do so, the standby engine will
deteriorate for want of use to such an extent that when
urgently needed it will not be effective. It is, therefore,
desirable that the attendant should run the engine at least
once in every three days to keep it in working order. If it can
be conveniently arranged, it is a good plan for the attendant
to run the engine for a few minutes to entirely empty the pump
well about six o'clock each evening. The bulk of the day's
sewage will then have been delivered, and can be disposed of
when it is fresh, while at the same time the whole storage
capacity is available for the night flow, and any rainfall
which may occur, thus reducing the chances of the man being
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account