The Story of the Atlantic TelegraphField, Henry M. (Henry Martyn)
History
The Story of the Atlantic Telegraph
Field, Henry M. (Henry Martyn)
Transatlantic cables
The Company being thus in working order, proceeded to make a contract
for the manufacture of a cable to be laid across the Atlantic. For many
months the proper form and size of the cable had been the subject of
constant experiments. The conditions were: to combine the greatest
degree of strength with lightness and flexibility. It must be strong, or
it would snap in the process of laying. Yet it would not do to have it
too large, for it would be unmanageable. Mr. Brett had already lost a
cable in the Mediterranean chiefly from its bulk. Its size and stiffness
made it hard to unwind it, while its enormous weight, when once it broke
loose, caused it to run out with fearful velocity, till it was soon lost
in the sea. It was only the year before, in September, 1855, that this
accident had occurred in laying the cable from Sardinia to Algeria. All
was going on well, until suddenly, "about two miles, weighing sixteen
tons, flew out with the greatest violence in four or five minutes,
flying round even when the drums were brought to a dead stop, creating
the greatest alarm for the safety of the men in the hold and for the
vessel." This was partly owing to the character of the submarine surface
over which they were passing. The bottom of the Mediterranean is
volcanic, and is broken up into mountains and valleys. The cable,
doubtless, had just passed over some Alpine height, and was descending
into some fearful depth below; but chiefly it was owing to the great
size and bulk of the cable. This was a warning to the Atlantic Company.
The point to be aimed at was to combine the flexibility of a common
ship's rope with the tenacity of iron. These conditions were thought to
be united in the form that was adopted.[B] A contract was at once made
for the manufacture of the cable, one half being given to Messrs. Glass,
Elliot & Co., of London, and the other to Messrs. R. S. Newall & Co., of
Liverpool. The whole was to be completed by the first of June, ready to
be submerged in the sea. The company was organized on the ninth of
December, and the very next day Mr. Field sailed for America, reaching
New York on the twenty-fifth of December, after an absence of more than
five months.
FOOTNOTES:
[A] Professor Morse was fond of the distinction between the words
practical and practicable. A thing might be practicable, that is,
possible of accomplishment, when it was not a practical enterprise, that
is, one which could be worked to advantage. He here argues that the
Atlantic Telegraph is both practicable, (or possible,) and at the same
time a wise, practical undertaking.
[B] On his return to America, many inquiries were addressed to Mr. Field
in regard to the form and structure of the cable, in answer to which he
wrote a letter of explanation in which he said:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account