The Story of the Cambrian: A Biography of a RailwayGasquoine, C. P. (Charles Penrhyn)
History
The Story of the Cambrian: A Biography of a Railway
Gasquoine, C. P. (Charles Penrhyn)
Cambrian Railway
[Picture: The late EARL OF POWIS, a prominent supporter of some of the
earlier Montgomeryshire Railway Schemes; The late MR. DAVID HOWELL,
Secretary to the Newtown and Machynlleth Railway Co. from its
inauguration till its amalgamation in the consolidated Cambrian Railways
Co. in 1864]
After speeches by Lord and Lady Vane, her ladyship "having put on a pair
of gauntlets, which were presented by the Committee of Management,
proceeded to cut the first sod, which, having been deposited in the
barrow presented by Messrs. Davies and Savin, the contractors, was
wheeled to the end of the plank, after which Mrs. E. D. Jones, of
Trafeign, performed the same ceremony, and was followed by Lord Seaham,
and the other junior olive branches of the family. The bands played in
their best style, and the cheering was most deafening, and thus ended
this portion of the day's proceedings."
The subsequent proceedings were of a highly convivial nature, as befitted
so auspicious an occasion. There was a generous imbibing of "a bountiful
supply of Mr. Lloyd's prime port, sherry, etc.," and "a procession of
miners and quarrymen, more than 100 of whom dined at the house of Mrs.
Margaret Owen, the White Lion Inn, perhaps the most noted house in the
county for the excellence of its ale."
The work on this line was of a rather different nature to that on which
the contractors had been engaged on the Newtown and Llanidloes, and in
bringing the Oswestry and Newtown line to completion. Instead of
meandering, more or less, along river-side lowlands, the track had to be
carried uphill and down-dale over the shoulder of the Montgomeryshire
highlands, ascending to an altitude of 693 feet above sea level at
Talerddig top by a climb of 273 feet from Caersws, and running down again
by a 645 feet drop to the Dovey Valley at Machynlleth. This involved a
gradient, at one point, of as much as 1 in 52, and, just after leaving
the summit the line had to pierce through the hillside. A tunnel was
originally thought of, but abandoned in favour of a cutting through solid
rock to a depth of 120 feet. It was while excavations between the summit
and the cutting were being made that the engineers discovered a strange
geological formation, which, still observable from the train on the
left-hand side immediately after leaving Talerddig station for
Llanbrynmair, has come to be popularly known as "the natural arch." The
work of excavating the cutting was no child's play. But it proved a
profitable part of the contract, and it seems to have furnished not only
enough stone for many of the adjacent railway works, but, according to
popular rumour, the foundation of Mr. David Davies's vast fortune.
Seeking an investment for the money he made out of it, it is said, Mr.
Davies turned his thoughts to coal and in the rich mineral district of
the Rhondda Valley it was sunk, rapidly to fructify, and to form the
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account