The story of the first trans-continental railroad : $b its projectors, construction, and historyBailey, William Francis
History
The story of the first trans-continental railroad : $b its projectors, construction, and history
Bailey, William Francis
Railroads -- United States -- History; Union Pacific Railroad Company
Another place that sprang into prominence during the time it was the
end of the track was "Phil Sheridan" located near the point where the
road crossed the hundredth Meridian, Mile Post four hundred and five.
During its brief existence it was a rattling noisy place, full of life
and vigor, rowdyism predominating. Not a stake, brick, or shingle is
left to mark its site. It was here the construction rested for nearly
a year and a half, financial troubles,--uncertainty as to whether to
build to San Diego, Cal., or Denver, and some very fine work on the
part of the Union Pacific proper being the occasion of the suspension
of work.
On June 26th, 1865, work was begun on the branch line from Leavenworth
to Lawrence (Leavenworth and Lawrence Railroad), Major B. S. Hennings
being in charge as Superintendent. Upon the completion of the branch
in the spring following, the headquarters of the Union Pacific
Railway--Eastern Division was moved to Lawrence, the operation of the
line being under the direction of R. H. Shoemaker, Superintendent,
who was succeeded in December, 1867, by George Noble. The work of
construction was in charge of General W. W. Wright.
At the meeting of the Company held April 1st, 1867, Mr. John D. Perry
of St. Louis was elected President, Mr. Adolph Meier of the same place
Vice-President, and among the directors was Thomas A. Scott, of
Philadelphia, (afterwards President of the Pennsylvania Railroad.)
In 1864 the population of the State of Kansas was one hundred and
thirty-five thousand eight hundred and seven and in 1870 when the line
was completed three hundred and sixty-four thousand three hundred and
ninety-nine. This marvelous increase was due in no small degree to the
construction of this line and the facilities it provided for the
settlers to reach the cheap land in the interior of the state as well
as the security it gave them against Indian depredations. Stage Lines
between the Missouri River points and Denver had been running between
St. Joseph, Atchison, and Omaha for several years, but after the line
was built some distance the route was changed and connection was made
between the end of the track and Denver by the Holliday Overland Mail.
Much trouble was caused by the Indians during the construction, even
more than was encountered: on the Union Pacific Railroad. To this
cause in no small degree were the delays of 1868 and 1869
attributable. It was necessary not only to arm the engineer corps,
but also the graders, the Government issuing arms and ammunition for
that purpose. Military escorts and guards were furnished by the Army
to the Railroad men, both on the grade or ahead surveying. For the
better protection of the road and construction forces Army Posts or
Forts proper were maintained as follows:
Fort Riley Mile Post 140
Fort Harker Mile Post 230
Fort Hays Mile Post 300
Fort Wallace Mile Post 412
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account