Tube, Train, Tram, and Car; or, Up-to-date locomotionBeavan, Arthur H. (Arthur Henry)
History
Tube, Train, Tram, and Car; or, Up-to-date locomotion
Beavan, Arthur H. (Arthur Henry)
Electric automobiles; Electric railroads; Street-railroads -- England -- London
_By permission of the_ _“Tramway and Railway World” Publishing Co.,
London_]
of a running tunnel, 16 feet in diameter, on the above line. The Great
Northern shield is much more powerful than any hitherto employed.
Greater hydraulic force is applied, and the “jacks” are more numerous,
and considerably larger. The shield used for the sixteen-foot tunnel may
be taken as typical of others up-to-date. Its cylindrical skin is
composed of half-inch steel plates riveted together at the bottom of the
indispensable shaft, which may be, in the future, anything from 50 to
500 feet beneath the surface. In length, the shield from the rear to the
cutting edge in front is 8 feet 9 inches, half of this being used by the
excavators (as in Brunel’s Thames tunnel), the after part for the
erectors of the metal segments of the tube. Round the shield front are
mounted ten heavy cast-steel cutters, the pressure upon them being no
less than two tons to the square inch, the hydraulic rams exerting this
pressure direct upon the back of the cutters, and the purchase is taken
off the edge of the nearest tunnel segment already in position. The
excavated soil is taken away in trolleys, which, as in a mine, are drawn
by ponies on a miniature track, and afterwards sent up to the surface by
the nearest shaft.
London clay is generally the kind of soil thus bored through in the
metropolitan tubes. The Central, while sinking the shafts, met with it
29½ feet below the surface; but before this was reached, 12 feet of made
ground, 18 inches of loam, and 16 feet of gravel, had to be pierced.
The London clay ran almost without a break between the Bank and
Shepherd’s Bush, the only hiatus being at a point between Red Lion
Street and Berner’s Street, where the Woolwich and Reading strata
cropped up, which proved to consist of hard, red, streaky clay, some
beds of white sand, and, strangely enough, beds of hard limestone rock,
whose presence had not been anticipated.
Tube railways are carried out at considerably varying depths; the
Central running in places 100 feet (_i.e._ the height of Westminster
Abbey’s nave) below the road, and at the Bank only 65 feet.
Some of the proposed tubes burrow much deeper; for instance those of
Charing Cross and Hampstead Railway will be from 120 to 216 feet below
the surface. Apparently, there is no reasonable limit to the depth at
which engineers are prepared to lay their railway tubes.
THE TUBE MOLE AT WORK
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account