of the material penetrated, and the method of construction employed. For
the purpose of detailed discussion the construction of masonry lining
may be divided into four parts,--the side-wall foundations, the side
walls themselves, the roof arch, and the invert.
Concrete and reinforced concrete linings are now extensively used on
account of cheapness and facility of handling, but they have the great
disadvantage of resisting pressure after they become hard, which is some
time after being placed. The strutting should, therefore, be left to
support the roof so as to prevent direct pressure on the fresh material.
The roof, as a rule, is supported by longitudinal planks held in
position by five or seven segments of arched frames placed across the
tunnel. A large quantity of timber and carpenter work is thus entirely
wasted and these costly items, in many cases, make the concrete lining
of a tunnel more expensive than the one built of brick and stone. To
avoid these inconveniences tunnels have been successfully lined with
concrete on the side walls and concrete blocks in the arches. These
blocks have been built by hand and molded in the shape of the arch
voussoirs.
=Foundations.=--In tunnels through rock of a hard and durable character
the foundations for the side walls are usually laid directly on the
rock. In loose rock, or rock liable to disintegration, this method of
construction is not generally a safe one, and the foundation excavation
should be sunk to a depth at which the atmospheric influences cannot
affect the foundation bed. In either case the foundation masonry is made
thicker than that of the side walls proper, so as to distribute the
pressure over a greater area, and to afford more room for adjusting the
side-wall masonry to the proper profile. In yielding soils a special
foundation bed has to be prepared for the foundation masonry. In some
instances it is found sufficient to lay a course of planks upon which
the masonry is constructed, but a more solid construction is usually
preferred.
This is obtained by placing a concrete footing from 1 ft. to 2 ft. deep
all along the bottom of the foundation trench, or in some cases by
sinking wells at intervals along the trench and filling them with
concrete, so as to form a series of supporting pillars.
[Illustration: FIG. 45.--Diagram Showing Forms Adopted for Side-Wall
Foundations.]
The form given to the foundation courses and lower portions of the side
walls varies. Where a large bearing area is required, the back of the
wall is carried up vertically as shown by the line _AB_, Fig. 45,
otherwise the rear face of the wall follows the line of excavation _AC_.
For similar reasons the front face of the wall may be made vertical, as
at _FG_, or inclined, as at _FH_. The line _FE_ indicates the shelf
construction designed to support the feet of the posts used to carry the
arch centers during the construction of the roof arch.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account