In the ordinary system of well boring, innumerable breakages and delays
occur when a boring is required to be carried to any depth exceeding 200
or 300 feet, owing to the buckling of the rods, the crystallization of
the iron by the constant jarring at each blow, and particularly the
increased weight of the rods as the hole gets deeper. It follows from
this, that where the excavation is very deep, there is considerable
difficulty in transmitting the blow of the tool, in consequence of the
vibration produced in the long rod, or in consequence of the torsion;
and, for the same reason, there is a danger of the blows not being
equally delivered at the bottom. It has been attempted to obviate this
difficulty, but without much success, by the use of hollow rods,
presenting greater sectional area than was absolutely necessary for the
particular case, in order to increase their lateral resistance to the
blows tending to produce vibration.
Boring is usually executed by contract. The approximate average cost in
England may be taken at 1_s._ 3_d._ a foot for the first 30 feet; 2_s._
6_d._ a foot for the second 30 feet; and continue in arithmetical
progression, advancing 1_s._ 3_d._ a foot for every additional 30 feet
in depth. This does not include the cost of tubing, conveyance of plant
and tools, professional superintendence, or working in rock of unusual
hardness, such as hard limestone and whinstone. A clause is usually
inserted in the contract, to the effect that, if any unforeseen
difficulty is met with in the course of the work, it is then paid for by
the day, at a rate previously determined upon, until the difficulty has
been overcome.
CHAPTER V.
AMERICAN TUBE WELL.
This well consists of a hollow wrought-iron tube about 1-3/4 inch
diameter, composed of any number of lengths from 3 to 11 feet, according
to the depth required. The water is admitted into the tube through a
series of holes, which extend up the lowest length to a height of 2-1/2
feet from the bottom.
The position for a well having been selected, a vertical hole is made in
the ground with a crowbar to a convenient depth; the well tube _a_,
having the clamp _d_, monkey _c_, and pulleys _b_, Fig. 95, previously
fixed on it, is inserted into this hole.
The clamp is then screwed firmly on to the tube from 18 inches to 2 feet
from the ground, as the soil is either difficult or easy; each bolt
being tightened equally, so as not to indent the tube.
The pulleys are next clamped on to the tube at a height of about 6 or 7
feet from the ground, the ropes from the monkey having been previously
rove through them.
[Illustration: Tube Well Assembly.
Fig. 95.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account