The canal from Bath to Newbury (under an Act of Parliament of George
III.) has been constructed for vessels drawing five feet of water,
measuring 14 feet wide, and according to the present soundings on the
lock-sills, vessels of that draught ought now to navigate the canal,
but they are not able to do so from the great accumulation of mud,
which is seldom less than one foot in thickness, and generally two feet
or more. This not only prevents the barges from using the canal for
carrying full cargoes, but necessitates the employment of extra towing
power. One horse would tow a barge 2 to 2½ miles an hour, if the canal
were kept in proper working order. At the present time two or more
horses are required to do what ought to be only the work of one. Many
of the lay byes throughout the canal were originally made to enable
vessels to turn; nearly all of these are now of no use, owing to their
being full of mud and weeds, consequently barges have often to go long
distances beyond their proper destination in order to turn. Owing to
the accumulation of mud on the sides of the canal, barges can only
pass one another with great difficulty, causing much loss of time.
The gearing of the paddles of most of the locks is very insufficient
and out of repair. On all properly managed navigations, dredgers are
kept almost constantly at work cleansing out the mud, which rapidly
accumulates, but on this canal there are none. The only men employed on
the canal are a few labourers to clean out the weeds with rakes, which
are deposited on the towing-paths, and allowed to remain for months,
thus obstructing the use of the paths. The pounds between the locks at
Devizes are nearly all full of mud and weeds.
The construction of the new port of Sharpness, opened in 1874, is due
to the Gloucester and Berkeley Canal Company, which constructed at
the small promontory of that name, about midway between Avonmouth and
Gloucester, a large tidal basin, 350 feet by 300 feet, a lock 320 feet
long, with three pairs of gates of large size, and a discharging dock
2200 feet long, and occupying an area of 13½ acres. The entrance to
the docks from the Severn is 60 feet wide, and the depth at high water
averages 26 feet.
The canal company, by this provision, has been able to retain for
Gloucester a great deal of the shipping which formerly, although
chartered for that city, has, owing to the old canal entrance being
too small, been obliged to discharge at one of the South Wales ports.
Almost simultaneously with this step, the Gloucester and Berkeley Canal
Company purchased the Worcester and Birmingham Canal, thereby enabling
water communication to be opened up with the heart of the Midlands.
THE ELLESMERE CANAL.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account