The only purpose originally intended to be served by the Stockton and
Darlington Railway was the finding of a better outlet for coal from the
South Durham coalfield. A company, with Edward Pease as the moving spirit,
was formed in 1816, but two years later the projectors were still undecided
whether to make a canal or "a rail or tramway." George Overton, who
preceded George Stephenson as a distinguished railway engineer, wrote to
them, however, advising the latter course. "Railways," he said, "are now
generally adopted, and the cutting of canals nearly discontinued"; and he
told them, further, that within the last fifteen years the great
improvements made in the construction of tram-roads had led to the
application of the principle to a number of new roads. His advice was
adopted, and the first Act, obtained after several unsuccessful efforts,
authorised the making and maintaining of "a railway or tramroad" from the
river Tees, at Stockton, to Witton Park Colliery, with various branches
therefrom. The line would, the Act said, be "of great public utility by
facilitating the conveyance of coal, iron, lime, corn and other commodities
from the interior of the county of Durham to the town of Darlington and the
town and port of Stockton," etc.
It was first intended to use wooden rails, and to rely on horse-power, no
authority for the employment of locomotives being obtained under the Act of
1821; but George {226}Stephenson, on being appointed engineer to the line,
persuaded the company to adopt iron rails in preference to wooden ones, and
to provide a locomotive such as he had already constructed and successfully
employed at Killingworth Colliery. Two-thirds of the rails laid were of
malleable iron and one-third of cast iron. It was not, however, until
September, 1824, that the order was actually given for a locomotive, some
of the promoters having still shown a strong preference for the use of
stationary engines and ropes.
The line was opened for traffic on September 27, 1825, and the locomotive
which had been ordered--the "Locomotion" as it was called--was ready for
the occasion. It weighed seven tons, and had perpendicular cylinders and a
boiler provided with only a single flue, or tube, 10 inches in diameter and
10 feet in length, the heat being abstracted therefrom so imperfectly that
when the locomotive was working the chimney soon became red-hot.[38] The
usual speed was from four to six miles an hour, with a highest possible of
eight miles an hour on the level.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account