A manual on the origin and development of WashingtonCaemmerer, H. Paul (Hans Paul)
History
A manual on the origin and development of Washington
Caemmerer, H. Paul (Hans Paul)
Washington (D.C.) -- Description and travel; Washington (D.C.) -- History
In the design of the station much thought was given to the
architectural features. Since Greece and Rome have furnished
architectural inspiration for so many of the public buildings of
Washington, a freely interpreted classic may be considered as the
recognized architecture of these structures; and as the new station was
to be the monumental gateway to the National Capital, it seemed fitting
that the architectural motives should be drawn from the triumphal
arches of Rome. They inspired Mr. Burnham to design the Union Station
as he did. Construction work was begun in August, 1902, the terminal
opened October 27, 1907, and was completed in April, 1908.
Some of the elements entering into the design of the terminal were
unique. In most cities the probable future growth and nature of
the traffic plays an important part in the planning of a passenger
terminal. Washington has very little suburban traffic; and as it will
never become a commercial center, the question of providing for future
growth was of minor importance. The main problem was how to care for
and provide against abnormal conditions, which arise at least once
every four years. The handling of inauguration crowds had always been
a heavy expense to the railroads, because they had to provide such
elaborate temporary facilities. On the other hand, to provide adequate
permanent facilities meant a large expenditure, with the attendant
heavy carrying charges. On account of the dilapidated condition of the
passenger facilities owned by the companies, and the urgent need of
larger and better terminals, a union terminal seemed to show advantages
over the separate stations provided for in the acts of 1901.
[Illustration: _Courtesy of Commercial Photo Co._
UNION STATION--CONCOURSE]
The layout embraces every feature and facility involved in the
construction of a first-class terminal, including a depot building
planned and constructed after the most modern lines, and containing
every feature for the convenience, comfort, and pleasure of the
traveling public; the most complete and up-to-date facilities for
conducting the business of a large railroad station; a main power
plant for furnishing power of every kind required for the successful
operation of the station and yards; a large and completely equipped
express terminal for caring for the express business handled by the
companies; a modern commodious roundhouse and shop layout for caring
for repairs to equipment; the most complete interlocking layout and
intercommunication system ever constructed; one of the most complete
passenger-equipment yards ever built; and a track system covering yards
and main tracks within the passenger-terminal zone aggregating about 60
miles of single track.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account