A treatise on the origin, progress, prevention, and cure of dry rot in timber : $b with remarks on the means of preserving wood from destruction by sea worms, beetles, ants, etc.Britton, Thomas Allen
Science
A treatise on the origin, progress, prevention, and cure of dry rot in timber : $b with remarks on the means of preserving wood from destruction by sea worms, beetles, ants, etc.
Britton, Thomas Allen
Dry-rot; Wood -- Preservation
The decay of wooden sleepers, posts, &c., on our railways and the
destruction of timber piles by worms have been the causes of directing
the attention of engineers to the preservation of timber. Most of our
leading engineers now have the greater portion of the timber used
in their works either creosoted or injected with chloride of zinc.
Architects, as a rule, do not, unfortunately, adopt any process for
preserving timber from rot and decay; and have practically no guarantee
that timber used in their works has been thoroughly seasoned: posterity
will not thank them for this, and yet they are not solely to blame. The
fault in a great measure rests with the public, who require buildings to
be erected at the least cost and in the shortest possible time. Moreover,
the works executed by our leading builders are so extensive, that they
have no room in their yards for large piles of timber to lie and season;
and even if they had room it is doubtful if they would allow so much
material, representing money, to remain idle. We are acquainted with one
instance where a London architect, about a dozen years ago, erected a
public building. The front of the reporters’ gallery was formed of oak
panelling; and within a year after the completion of the building narrow
slips or tongues of wood had to be let in in several places to fill up
the holes formed by the shrinkage of the panels. Similar cases to this
are by no means rare. We can quote another instance of unseasoned wood.
A range of workshops was erected a few years since in South London; the
principals of the roof were not ceiled; almost before the building was
finished the upper floor was occupied by a battalion of workwomen. The
heat of the room (the ventilation being defective) soon had an effect
upon the tie-beams, but one beam, which we imagine was unseasoned, in
consequence of large shakes and splits, had to be taken out and replaced
with new. We will (as a lawyer would say), cite one more case. A church
in Surrey required some extensive repairs to the roof: an architect and
a builder were employed, and the necessary works were done. Within four
years dry rot has made its appearance on the new timbers of the roof (not
an air-tight one). One of the churchwardens, on consulting us last year
(1874) as to the best means of stopping the rot, energetically remarked,
“Who is responsible to us for this, the architect or the builder?”
Charles Dickens, in his edition of ‘Bleak House’ in 1868, wrote, with
reference to long Chancery suits, “If I wanted other authorities for
Jarndyce and Jarndyce, I could rain them on these pages.” We are able to
make a similar remark with reference to any more instances of dry rot.
According to the 7th chapter of the First Book of Kings, “Solomon was
building his own house thirteen years:” we cannot spare so much time
now-a-days over the erection of a house, but that is no reason why our
timber should not be naturally or artificially seasoned.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account