Account of the Skerryvore lighthouse : $b with notes on the illumination of lighthousesStevenson, Alan
History
Account of the Skerryvore lighthouse : $b with notes on the illumination of lighthouses
Stevenson, Alan
Skerryvore Lighthouse (Hebrides, Scotland)
The outline of the circular foundation pit, 42 feet in diameter, having
been traced with a trainer on the rock, numerous jumper-holes were
bored in various places, having their bottoms all terminating in one
level plane, so as to serve as guides for the depth to which the basin
was to be excavated. The depth did not exceed 15 inches below the
average level, already laid bare by the cutting of the rough horizontal
floor which has just been described; and before the close of the season
of 1839, about _one-third_ of the area of the circle had been cleared,
and was ready for the final pick-dressing which prepared it for the
reception of the first course. The excavation of this circular basin
was conducted with the greatest caution, and few shots were permitted
to be fired lest the foundation should in any place be shaken by the
action of the gunpowder on any of the natural fissures of the Rock. The
work was chiefly done by means of what are called _plugs and feathers_,
the form of which has already been shewn in the woodcuts (No. 12,
p. 115). In that part of the work the bores were nearly horizontal,
and the action of the _plug and feathers_ was to throw up a thin
superficial shelf or paring of rock of from 6 to 12 inches in depth,
and not more than 2 feet square. By that painful process an area of
about 1400 superficial feet was cleared. The chief trouble connected
with that operation was cutting, by means of the pick, a vertical
face for the entrance of the horizontal _jumpers_ or boring rods; and
wherever advantage could be taken of natural fissures it was gladly
done. Another considerable source of labour was the dressing of the
vertical edges of the basin, as that implied cutting a _square check_,
15 inches deep and about 130 feet long, in the hardest gneiss rock; and
the labour attending which, can only be fully estimated by a practical
stone-cutter who has wrought in such a material. The plan employed was
to bore all around the periphery of the circle, 1⁵⁄₈ inch vertical
jumper-holes, 6 inches apart, to the required depth, and to cut out
the stone between them. The surface thus left was afterwards carefully
dressed, so as to admit vertical and horizontal moulds, representing
truly the form of the masonry which the check was intended to receive.
The experience of the labour attending that operation gave me great
reason for congratulation on having adopted a foundation on one level
throughout, instead of cutting the rock into several terraces, at each
of which the same labour of cutting angular checks must necessarily
have been encountered. The cutting of the foundation occupied 20 men
for 217 days in all, whereof 168 days were in the season of 1839, and
the rest in the summer of 1840.
~Fitting up of the Second Barrack on the Rock.~
~Sudden death of George Middlemiss.~
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account