After building a few courses above the level of the solid part of the
Tower, the jib-crane could no longer be conveniently used, and recourse
was had to a _balance-crane_, which, during the previous winter, I
had caused to be constructed at Edinburgh, in the workshop of Mr
James Dove. That apparatus, which, except as to its greater size and
strength, in order to suit the greater dimensions of the Tower, was
almost identical with that which was used at the Bell Rock, is shewn
in Plate IX.; and it is only necessary, in this place, to notice its
general construction and mode of working, which is also shewn in Plate
XVII. of my Father’s Account of the Bell Rock Lighthouse. In the hollow
of the Tower, a cast-iron pipe or pillar was erected, susceptible of
being lengthened as the Tower rose, by means of additional pieces of
pillar let in by _spigot and faucet joints_; and on the pillar a frame
of iron was placed capable of revolving freely round it, and carrying
two trussed arms and a double train of barrels and gearing. On the one
arm hung a cylindric weight of cast-iron, which could be moved along
it by means of the gearing, so as to increase or diminish by leverage
its effect as a counterpoise; and on the other was a roller. The roller
was so connected with the weight on the opposite arm, as to move along
with it, receding from, or approaching to, the centre pillar of iron in
the same manner as the weight did. From the roller hung a sheave, over
which a chain moved, with a hook at the end for raising the stones.
When a stone was to be raised, the weight and the sheave were drawn
out to the end of the arms of the crane, which projected over the
outside of the walls of the Tower, and they were held in their places
by simply locking the gearing which moved them. The second train of
gearing was then brought into play to work the chain which hung over
the sheave, and so to raise the stone to a height sufficient to clear
the top of the wall. When in that position, the first train of gearing
was slowly unlocked and the slight declivity inwards from the end of
the arms formed an _inclined plane_, along which the roller carrying
the sheave was allowed slowly to move (one man using a break on the
gearing to prevent a rapid run), while the first train of gearing was
slowly wound by the others, so as to take up the chain which passed
over the sheave, and thus to keep the stone from descending too low in
proportion as it approached the centre of the Tower. When the stone so
raised had reached such a position as to hang right over the wall, the
crane was made to turn round the centre column in any direction that
was necessary, in order to bring it exactly above the place where it
was to be _set_; and by working either train of gearing, it could be
moved horizontally or vertically in any way that was required. The men
who wrought the crane, stood on two small stages of planks attached to
either side of the framework, and moving round the shaft along with it.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account