Account of the Skerryvore lighthouse : $b with notes on the illumination of lighthousesStevenson, Alan
History
Account of the Skerryvore lighthouse : $b with notes on the illumination of lighthouses
Stevenson, Alan
Skerryvore Lighthouse (Hebrides, Scotland)
From the extent of the foul ground round the Skerryvore, and the
absence of good harbours in the neighbourhood, it was foreseen at the
outset that the operation of landing about 6000 tons of materials on
the Rock could not be accomplished by means of sailing vessels with
that degree of certainty or regularity which was desirable, in order to
obtain the full benefit of the short working season which the climate
of the Western Hebrides affords; and the necessity for providing a
steam tender was, therefore, generally admitted. It has already been
stated, that, in order to avoid the expense attending the building
of a vessel for this purpose, application was made at the principal
ports of the kingdom, with the view of purchasing a suitable vessel;
but, although twenty-four vessels of nearly the required dimensions
were offered for sale, not one of them was considered fit for such a
service, the great majority being light craft, such as are generally
used in river and port navigation. It was therefore found necessary to
build a steamer; for which purpose, specifications and drawings were
prepared, and after receiving various tenders from respectable parties,
a contract was entered into with Messrs Menzies and Sons, shipbuilders,
and Messrs J. B. Maxton and Co., engineers, both of Leith, for building
a steamer of 150 tons, with two engines of 30 horse power each.
The use of a steamer, at the very outset of the works, would doubtless
have proved of the greatest service in the erection of the barrack
on the Rock, and would have materially lightened our cares and
toils; but I am not sure that I should have acquired so thorough an
acquaintance with the difficulties and dangers of the Skerryvore, or
that I should have been so well prepared for all the obstacles that
presented themselves in the after parts of the work, had the first
season’s operations been conducted under those advantages which are
always derived from the use of steam-power. As it was, we had much to
bear from the smallness of the Lighthouse Tender, named the _Pharos_,
a vessel of 36 tons, new register, which was all the regular shipping
attendance we possessed during this first season; and the inconvenience
arising from her heavy pitching, was, to landsmen, by no means the
least evil to be endured. But the frequent loss of opportunities, of
which we might easily have availed ourselves, if we had possessed the
command of steam-power, and the danger and difficulty of managing
a sailing vessel in the foul ground near the Rock, and between it
and Tyree, were, perhaps, even more felt by the seamen than by the
landsmen; and if the experience of a single year’s work can form any
ground for an estimate of the length of time required for building the
Skerryvore Lighthouse, with a sailing vessel, I should say, we must
still (even in 1845) have been engaged in the masonry part of the work,
which was finished on the 25th July 1842.
~Employment and Wages of Workmen.~
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account