Early in the month of May the preparation of the wooden barrack for
the Rock had been completed, and the whole had been set up in the
workyard at Greenock; and when I visited it for the last time about the
5th of that month, I found it all ready for shipment, excepting some
additional iron ties, which I ordered for securing the turret to the
top of the pyramid, which were to be applied at the level of the floor
of the upper or barrack-room storey. I also found that the moorings,
including the mushroom anchors and chains, and the workyard materials,
consisting of several cranes, trucks, a janker for the transport of
timber, and a Woolwich sling-cart for carrying stones to the various
sheds, were in the course of preparation. A large assortment of
masons’ and quarriers’ tools was at the same time ready for shipment
at Aberdeen. Early in June, a vessel called the Duke of Montrose was
chartered to carry coals to Tyree, both for household purposes and for
the work; and two small portable smiths’ forges were prepared for use
on the Rock.
~Embark for Skerryvore.~
In providing the means of efficiently carrying on so many complicated
operations in a situation so difficult and remote, it is impossible,
even with the greatest foresight, to avoid omissions; while delay of
a most injurious kind may result from very trivial wants. Even the
omission of a handful of sand, or a piece of clay, might effectually
stop for a season the progress of plans, in the maturing of which
hundreds of pounds had been expended. Accordingly, although I had
bestowed all the forethought which I could give to the various details
of the preparation for the season (of which I found it absolutely
indispensable to be personally aware, even to the extent of the cooking
dishes), new wants were continually springing up, and new delays
occasioned, so that it was not until the evening of the 23d of June
that I could embark at Tobermory in the _Pharos_ Lighthouse Tender,
commanded by Mr Thomas Macurich, with all the requisites on board for
commencing the season’s operations. Next morning we moored off Hynish
Point about three o’clock, and, from the roughness of the passage, were
not unwilling to land at that early hour. Here I found that Mr Scott,
the foreman of the workyard, had, notwithstanding the unworkable nature
of the Rock, more particularly afterwards noticed, procured about sixty
fine blocks of gneiss, as the produce of the Tyree quarries, which
had been wrought for upwards of 15 months; and had at the same time
completed the masonry of a range of buildings for stores and barracks,
capable of containing upwards of 100 men, and had built about 100 feet
in length of a landing-pier, reaching nearly to low-water mark. A
magazine for gunpowder, of which a considerable stock was required for
quarrying purposes, had also been built; and a piece of garden ground
had been inclosed and stocked for the use of the people to be employed
at the works.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account