4. CAPACITY.--(_a_) Must be sufficient to furnish gas continuously
for the maximum lighting period to all lights installed. A lighting
period of at least 5 hours shall be provided for in every case.
(_b_) Generators for conditions of service requiring lighting period
of more than 5 hours must be of sufficient capacity to avoid recharging
at night. The following ratings will usually be found advisable.
(i) For dwellings, and where machines are always used intermittently, the
generator must have a rated capacity equal to the total number of burners
installed.
(ii) For stores, opera houses, theatres, day-run factories, and similar
service, the generator must have a rated capacity of from 30 to 50 per
cent, in excess of the total number of burners installed.
(iii) For saloons and all night or continued service, the generator must
have a rated capacity of from 100 to 200 per cent. in excess of the total
number of burners installed.
(_c_) A small generator must never be installed to supply a large
number of lights, even though it seems probable that only a few lights
will be used at a time. _An overworked generator adds to the cost of
producing acetylene gas_.
5. CARBIDE CHARGES.--Must be sufficient to furnish gas continuously for
the maximum lighting period to all burners installed. In determining
charges lump carbide must be estimated as capable of producing 4-1/2
cubic foot of gas to the pound, commercial 1/4-inch carbide 4 cubic feet
of gas to the pound, and burners must be considered as requiring at least
25 per cent. more than their rated consumption of gas.
6. BURNERS.--Burners consuming one-half of a cubic foot of gas per hour
are considered standard in rating generators. Those having a greater or
less capacity will decrease or increase the number of burners allowable
in proportion.
Burners usually consume from 25 to 100 per cent. more than their rated
consumption of gas, depending largely on the working pressure. The so-
called 1/2-foot burner when operated at pressures of from 20- to 25-
tenths inches water column (2 to 2-1/2 inches) is usually used with best
economy.
7. PIPING.--(_a_) Connexions from generators to service-pipes must
be made with right and left thread nipples or long thread nipples with
lock nuts. All forms of unions are prohibited.
(_b_) Piping must, as far as possible, be arranged so that any
moisture will drain back to the generator. If low points occur of
necessity in any piping, they must be drained through tees into drip cups
permanently closed with screw caps or plugs. No pet-cocks shall be used.
(_c_) A valve and by-pass connexion must be provided from the
service-pipe to the blow-off for removing the gas from the holder in case
it should be necessary to do so.
(_d_) The schedule of pipe sizes for piping from generators to
burners should conform to that commonly used for ordinary gas, but in no
case must the feeders be smaller than three-eighths inch.
The following schedule is advocated:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account