of Carbonic acid gas, which however though partially successful was
afterwards abandoned. "But the great work by which his name will be
transmitted to posterity is the Thames Tunnel which, though almost a
complete failure as a commercial transaction is nevertheless a wondrous
monument of engineering skill and enterprise. It was commenced in
March, 1825, and opened to the public in 1843, after a multitude of
obstacles and disasters." He held extensive premises at Battersea on
the site now occupied by the Citizen Steam-boat Company, where his
celebrated saw and veneer mills were burned down about the year 1814.
He was elected a Fellow of the Royal Society in 1814; was appointed
Vice-President in 1832. He was Knighted in 1840. Died Dec. 1849, in his
eighty first year, universally respected.
Sir Richard Phillips, who had an opportunity of inspecting Brunel's
machinery at Battersea, eulogizes his fame and speaks of his merits and
scientific genius thus:--"A few yards from the toll-gate of the Bridge
on the western side of the road stand the workshops of that eminent,
modest, and persevering mechanic Mr. Brunel, a gentleman of the rarest
genius who has effected as much for the mechanic arts as any man of
his time. The wonderful apparatus in the Dockyard at Portsmouth with
which he sets blocks for the navy, with a precision and expedition
that astonish every beholder, secures him a monument of fame and
eclipses all rivalry." At Battersea Works Sir Richard witnessed four
circular saws, two of them 18-ft. in diameter and two of them 9-ft.
in diameter, besides other circular saws much smaller used for the
purpose of separating veneers. He saw planks of mahogany and rosewood
sawn into veneers the 16th of an inch thick. By the power that turned
those tremendous saws he beheld a large sheet of veneer 10-ft. long by
2-ft. broad separated in ten minutes "so even and so uniform that it
appeared more like a perfect work of nature than one of human art." In
another building Sir Richard was shown Mr. Brunel's manufactory for
shoes, where the labour was sub-divided so that each shoe passed by
aid of machinery through twenty-five hands complete from the hide as
supplied by the currier. By this means a hundred pairs of strong and
well-finished shoes were made per day. He remarks, "each man performs
but one step in the process, which implies no knowledge of what is
done by those who go before or follow him. The persons employed are
not shoemakers, but wounded soldiers, who are able to learn their
respective duties in a few hours. The contract at which these shoes are
delivered to Government is 6s. 6d. per pair, being at least 2s. less
than were paid previously for an unequalled and cobbled article." The
shoes thus made for the Army were tried for two years but afterwards
abandoned from economical views.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account