The large British tank had been successful in its operations on the
battle front, but its very decided limitations, recognized by British
authorities, caused our officers to think it best to redesign the large
tank in preference to copying the existing big British tank with its
limitations.
General "fighting" specifications for the big tank were laid down by
the British general staff at the conference at British headquarters
at which American officers were present. It was agreed that this big
tank, known as the Mark VIII, should be of Anglo-American design and
construction. Arrangements were made for producing 1,500 of this type.
To do this, Great Britain and the United States entered into a working
agreement that provided for England to furnish the hulls, guns, and
ammunition, while the United States was to furnish the power plant and
driving details of the monster. Roughly speaking, each tank would cost
about $35,000, of which $15,000 represented the American part of the
job, on which some 72 contractors were at once engaged. About 50 per
cent of the work on these tanks had been completed when the armistice
was signed, and the first units were undergoing trials.
It was confidently expected that all of the 1,500 contracted for
would have been completed by March, 1919. While these Anglo-American
tanks were in the process of construction there were also being built
here 1,450 all-American tanks of the large English type, and for this
all-American tank 50 per cent of the work had also been done at the
signing of the armistice.
In December, 1917, a sample French tank of the Renault type reached
this country along with detailed drawings and a French engineer.
Much difficulty then ensued in getting American concerns to take on
production of this machine, because of the difficult nature of its
manufacture. Considerable time, too, was taken up in changing the
drawings from the French metric dimensions to the American dimensions,
and this involved redesigning many parts.
In the manufacture of the armor built for the Renault type of tank
the French made no attempt to adhere to simple shapes, and for this
reason practically a new source of supply for this kind of armor had
to be developed. Contracts for 4,440 of the Renault type of tanks
were finally made. The approximate cost of each one of these machines
was $11,500. Manufacturing activities for the various parts had to be
divided up among more than a score of plants, so that many plants were
turning out parts for these machines, while the assembling was done at
only three plants, which also made a portion of the parts.
The three assembly plants were the Van Dorn Iron Works, of Cleveland,
Ohio; the Maxwell Motors Co., of Dayton, Ohio; and the C. L. Best Co.,
also of Dayton.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account